My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1984-017
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1984
>
Res 1984-017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2007 3:06:24 PM
Creation date
8/30/2007 3:06:24 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1984-17
Date
3/12/1984
Volume Book
64
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> III <br /> STATE Texas <br /> WATERSHED Uoper San Marcos Rive1 <br /> AGREEMENT NO. <br /> UNITED STATES DEPARTMENT OF AGRICULTURE <br /> SOIL CONSERVATION SERVICE <br /> AGREEMENT FOR SERVICE <br /> THIS AGREEMENT made this 12 day of March , 19 ~ by and <br /> between the City of San Uarcos, hereinafter referred to as the City and the <br /> Soil Conservation Service, an agency of the Department of Agriculture, hereinafter <br /> referred to as the Service, <br /> WITNESSETH THAT: <br /> WHEREAS, under the provisions of the Flood Cöntrol Act of 1944, the City <br /> and the Service agreed to a work plan on the above watershed, which in part <br /> provides for the construction of a basic recreational facility along the <br /> San Marcos River, <br /> NOW THEREFORE, the City and the Service, in consideration of their mutual <br /> promises to each other hereinafter set forth, herein agree as follows: <br /> A. It is agreed that the following described engineering services are to be <br /> prepared by a private engineering firm at an estimated cost of $20,000-.00. <br /> Construction plans and specifications for the recreational facilities <br /> B. The City will: <br /> 1. Provide SO percent of the cost of engineering services described <br /> in A. This cost is estimated to be $10,000.00. Upon receipt of a bill <br /> make payment to the Service for the City's share of the cost of the <br /> works improvement. <br /> Payment must be received within 30 calendar days from the date of <br /> the bill, otherwise, it will be considered a late payment. For <br /> such late payments, interest will be accrued on the unpaid amount <br /> at a percentage rate based on the current value of funds to the <br /> U.S. Treasury for each 30 day period or portion thereof that the <br /> payment is delayed. Payments made by wire will be accepted and <br /> credited on the date received by the designated collection officer. <br /> 2. Accept all financial and other responsibility for excess. costs <br /> resulting from their failure to obtain, or their delay in obtaining <br /> adequate land and water rights, permits and licenses needed for the <br /> engineering services described in A. <br /> 3. Designate an individual to serve as liaison between the City and <br /> the Service with authority and Fesponsibility for reviewing and <br /> approving changes in the work described in A. Furnish such informa- <br /> tion in writing to the State Administrative Officer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.