Laserfiche WebLink
<br /> Policy 4-1: The City will meet as soon as possible with <br /> the Public Utility Commission to enlarge San <br /> Marcos' service area to include the area <br /> within the extraterritorial jurisdiction, <br /> except for those areas currently served by <br /> another authorized utility. <br /> WASTEWATER COLLECTION SYSTEM <br />Goal: To provide a wastewater collection system that is <br />- <br /> adequate to collect and treat the wastewater of San <br /> Marcos in an efficient and practical manner as the City <br /> grows. <br />Objective 1: To increase the capacity of the wastewater <br /> treatment facilities, including the main lift <br /> station, so that the wastewater of San Marcos ln <br /> the year 2000 can be adequately treated. <br /> Policy 1-1: The City will monitor its growth and <br /> population curve and make improvements to the <br /> wastewater treatment facilities, including the <br /> main lift station, well in advance of the <br /> demand, in such increments as necessary. <br /> Policy 1-2: The City will follow the recommendations of <br /> the City of San Marcos Facility Plan, 1981, <br /> and will implement such improvements as soon <br /> as possible. <br /> Policy 1-3: The City will take whatever action is <br /> necessary to prevent future wastewater <br /> overflow, especially into the San Marcos <br /> River. <br /> policy 1-4: The City will begin replacing wastewater <br /> collection lines on a priority basis to <br /> eliminate the extra wastewater that creates <br /> capacity problems and overflows during wet <br /> weather, and that has to be treated at the <br /> plant. <br />