Laserfiche WebLink
<br />1.7.1 Providing analyses of the Owner's needs, and pro- struction, and furnishing services as may be required in <br />gramming the requirements of the Project. connection with the replacement of such Work. <br />1.7.2 Providing financial feasibility or other special 1.7.16 Providing services made necessary by the default <br />studies. of the Contractor, or by major defects or deficiencies in <br />1.7.3 Providing planning surveys, site evaluations, envi- the Work of the Contractor, or by failure of performance <br /> of ei ther the Owner or Contractor under the Contract for <br />ronmental studies or comparative studies of prospective Construction. <br />sites, and preparing special surveys, studies and submis- 1.7.17 Preparing a set of reproducible record drawings <br />sions required for approvals of governmental authorities <br />or others having jurisdiction over the Project. showing significant changes in the Work made during <br />1.7.4 Providing services relative to future facilities, sys- construction based on marked-up prints, drawings and <br /> other data furnished by the Contractor to the Architect. <br />tems and equipment which are not intended to be con- 1.7.18 Providing extensive assistance in the utilization of <br />structed during the Construction Phase. any equipment or system such as initial start-up or testing, <br />1.7.5 Providing services to investigate existing conditions adjusting and balancinK preparation of operation and <br />or facilities or to make measured drawings thereof, or to maintenance manuals, training personnel for operation <br />verify the accuracy of drawings or other information fur- and maintenance, and consultation during operation. <br />nished by the Owner. 1.7.19 Providing services after issuance to the Owner of <br />1.7.6 Preparing documents of alternate, separate or the final Certificate for Payment, or in the absence of a <br />sequential bids or providing extra services in connection final Certificate for Payment, more than sixty days after <br />with bidding, negotiation or construction prior to the the Date of Substantial Completion of the Work. <br />completion of the Construction Documents Phase, when 1.7.20 Preparing to serve or serving as an expert witness <br />requested by the Owner. in connection with any public hearing, arbitration pro- <br />1.7.7 Providing coordination of Work performed by ceeding or legal proceeding. <br />separate contractors or by the Owner's own forces. 1.7.21 Providing services of consultants for other than <br />1.7.8 Providing services in connection with the work of the normal architectural, structural" mechanical and elec- <br />a construction manager or separate consultants retained trical engineering services for the Project. <br />by the Owner. 1.7.22 Providing any other services not otherwise in- <br />1.7.9 Providing Detailed Estimates of Construction Cost, cluded in this Agreement or not customarily furnished in <br />analyses of owning and operating costs, or detailed quan- accordance with generally accepted architectural practice. <br />tity surveys or inventories of material, equipment and 1.8 TIME <br />labor. The Architect shall perform Basic and Additional <br /> 1.8.1 <br />1.7.10 Providing interior design and other similar ser- Services as expeditiously as is consistent with professional <br />vices required for or in connection with the selection, skill and care and the orderly progress of the Work. Upon <br />procurement or installation of furniture, furnishings and request of the Owner, the Architect shall submit for the <br />related equipment. Owner's approval a schedule for the performance of the <br />1.7.11 Providing services for planning tenant or rental Architect's services which shall be adjusted as required as <br />spaces. the Project proceeds, and shall include allowances for peri- <br />1.7.12 Making revisions in Drawings, Specifications or ods of time required for the Owner's review and approval <br /> of submissions and for approvals of authorities having <br />other documents when sLch revisions are inconsistent jurisdiction over the Project. This schedule, when approved <br />with written approvals or instructions previously given, by the Owner, shall not, except for reasonable cause, be <br />are required by the enactment or revision of codes, laws exceeded by the Architect. <br />or regulations subsequent to the preparation of such doc- <br />uments or are due to other causes not solely within the ARTICLE 2 <br />control of the Architect. <br />1.7.13 Preparing Drawings, Specifications and supporting THE OWNER'S RESPONSIBILITIES <br />data and providing other services in connection with 2.1 The Owner shall provide full information regarding <br />Change Orders to the extent that the adjustment in the <br />Basi c Compensation resulting from the adjusted Con- requirements for the Project including a program, which <br />struction Cost is not commensurate with the services re- shall set forth the Owner's design objectives, constraints <br />quired of the Architect, provided such Change Orders are and criteria, including space requirements and relation- <br />required by causes not solely within the control of the ships, flexibility and expandability, special equipment and <br />A rchi tect. systems and site requirements. <br />1.7.14 Making investigations, surveys! valuations, inven- 2.2 If the Owner provides a budget for the Project it <br />tories or detailed appraisals of existing facilities, and serv- shall include contingencies for bidding. changes in the <br />ices required in connection with construction performed Work during construction, and other costs which are the <br />by the Owner, responsibility of the Owner, including those described in <br /> this Article 2 and in Subparagraph 3.1.2. The Owner shall, <br />1.7.15 Providing consultation concerning replacement of at the request of the Architect, provide a statement of <br />any Work damaged by fire or other cause during con- funds available for the Project, and their source. <br />AlA DOCUMENT 8141 . OIV"ER-,\RCHITECT AG~EEMENT . THIRTEENTH EDITION. JULY 1977. AlA'" . @ 197ï 8141-1977 <br />THE AMERICA" I",STITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N,W, WASHiNGTON, D.C 20006 5 <br />