My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1984-046
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1984
>
Res 1984-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2007 3:29:52 PM
Creation date
8/31/2007 3:29:52 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1984-46
Date
5/29/1984
Volume Book
66
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> ARTICLE 14 <br /> BASIS OF COMPENSATION <br />The Owner shall compensate the Architect for the Scope of Services provided, in accordance with Article 6, Payments <br />to the Architect, and the other Terms and Conditions of this Agreement, as follows: <br />14.1 AN JNJTIAL PAY¡\1ENT of dollars ($ -0- ) <br /> shall be made upon execution of this Agreement and credited to the Owner's account as follows: <br />14.2 BASIC COMPENSA T!ON <br />14.2.1 FOR BASIC SERVICES, as described in Paragraphs 1.1 through 1.5, and any other services included in Article 15 <br /> as part of Basic Services, Basic Compensation shall be computed as follows: <br /> lil"re insert hJ"5 of compematioll, inclueling ¡:xed amounts, multiples cr l>crcpntagEs, and identify Plu",s to which particular methods of compensa- <br /> I/on apply, if necessary,) <br /> Ten percent (10%) of total construction cost, not to exceed $1,300.00 <br />14.2.2 Where compensation is based on a Stipulated Sum or Percentage of Construction Cost, payments for Basic <br /> Services shall be made as provided in Subparagraph 6.1,2, so that Basic Compensation for each Phase shall <br /> equal the following percentages of the total Basic Compensation payable: <br /> (lccludc an,' additional Phases as appropriate,' <br /> Schematic Design Phase: ten percent no %) <br /> Design Development Phase: fifteen percent (15 %ì <br /> Constru ction Documents Phase: fifty percent (50 %) <br /> Bidding or Negotiation Phase: five percent (05 0/0) <br /> Construction Phase: twenty percent (20 %) <br />14.3 FOR PROJECT REPRESENTr'\TION BEYOND BASIC SERVICES, as described in Paragraph 1.6, Compensation shall <br /> be computed separately in accordance with Subparagraph 1.6.2, <br />AlA DOCUME~T 8141 . O\\'\)ER.ARCHITECT AGR[E\IE~ T . THIR7EENTH EOITO, . JULY 1977 . AIA@ . @ 1977 8141-1977 9 <br />THE AMERICAN INSTln;n OF ARCHlcECTS, 1735 "EIV YORK AVENUE, N.IV., WASH!,GTON, D,c. 20006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.