Laserfiche WebLink
<br /> 6. interpretation ofContrilct Documents: Transmit to CONTRACTOR ENGINEER's clarifications and interpretations <br /> of the Contract Documents. <br /> 7, ,Hodiflcations: Consider and evaluate CONTRACTOR's suggestions for modifications in. Drawings or Specifications <br /> and report them with recommendatio-ns to ENGINEER. <br /> 8. Records: <br /> a. Maintain at the job site orderly files for correspondence, reports of job conferences, Shop Drawings and samples <br /> submissions, reproductions of original Contract Documents including aU addenda, chang,e orders. field orders,'addi- <br /> tional Drawings.issued subsequent to the executiùn of the Contract, ENGINEER's clarifications and interpretations <br /> of the Contract Documents. progress reports, and other Project related documents. <br /> b. Keep a diary or log book. recording hours on the job site, weather conditions. data relative to questions of extras <br /> or deductions, list of visiting officials and representatives of manufacttJ.rers, fabricators, Sl1ppliers and distributors, <br /> daily activities, decisions. observ,ations in general and specific observations in more detail as in the case Gf observing <br /> test procedures. Send copies to ENGINEER. <br /> c. Record names~ addresses and telephone numbers of all CONTRACTORS, subcontractors and major suppliers of <br /> matërials and eq uipment. <br /> 9. Reports: <br /> a. Furnish ENGINEER periodic,reports as required of progress of the Work and CONTRACTOR's compliance with the <br /> approved progress scheduJ.e and schedule of Shop Drawing submissions. <br /> b. Consult with ENGINEER in advance of scheduled major tests, inspections or start of important phases df the <br /> work. <br /> c. Report immediately to ENGINEER upon the occurrence of any accidenl. <br /> iO, Payment Requisitions: Review applications for payment with CONTRACTOR for compliance with the established <br /> procedure for their submission and forward them with recommendations to ENGINE'ER, noting par1icularly their <br /> relation to the schedule of values, Work completed and materials and equipment delivered at the site but not incor- <br /> porated in the Work. <br /> ii. Certificates, /'Yfaintenance and Operation ¡Hanlln/s.' During the course of the Work, verify that certificates, maintenance <br /> and operation manuals and other data required to be assembled and furnished by CONTRACTOR are applicable to <br /> the items actually inst~lled: and delivenhis material to ENGINEER for his re'l'iew and forwarding to OWNER prior <br /> to final acceptance of the Work. <br /> 12. Completion,' <br /> a. Before ENGINEER issues a Certificate of Substantial Completion, submit to CONTRACTOR a list of observed <br /> items requiring completion or correction, <br /> b. Conduct final in-spection in the company of ENGINEER. OWNER and CONTRACTOR and prepare a final list of <br /> items to be completed or corrected. <br /> c. Verify that aIJ items on final list have been completed or corrected and make recomme-ndations to ENGINEER <br /> concerning acceptance, <br /> C, Limitations of Authority, <br /> Except upon wrjtten instructions of ENGINEER. Resident Project Representative: <br /> i. Shall not authorize any deviation from the Contract Documents or approve any substitute materials or equipment. <br /> 2. ShaH not exceed limitations on ENGINEER's authority as set for1h in the Contract Documents, <br /> 3. Shall not undertake any of the responsibilities of CONTRACTOR, subcontractors or CONTRACTOR's superintendent. <br /> or expedite the Work. <br /> 4. ShaJl not advise on or- issue directions relative to any aspect of the means, methods, techniques, sequences or <br /> procedur.es of construction u¡;lless such is specifìcalIy called for in the Contract Documents. <br /> 5. Shall not advise on o. issue directions as to safety precautions and programs in connection with the Work. <br /> 6. Shall not authorize OWN ER to occupy the Project in whole or in par1- <br /> 7. ShaJl not par1icipate in specialized field or laboratory tests. <br /> Pnp;ored by En¡In..,r" JoIn' Con'r.,,! Docum<n" Cnmmrllee <br /> Pub¡oshedJO'n,¡y by' Profe"",n.} En¡In..,,'m Pnv..e Pr"IIce" rr.w<c Or m>on of ,he N.,"",I Sone'Y of Profe"",n.¡ FolI'nee". Arne ne.n Consult,"¡ Fnpn«" Counni; Arne"".n Soc..!, <br /> of CiYO! Fn¡"",e" <br />