Laserfiche WebLink
<br /> ATTACH~1ENT c <br /> DUTIES, RESPONSIBILITIES AND LIMITATIONS <br /> FOR <br /> PROJECT PERFORMANCE SERVICES <br /> WASTEWATER COLLECTION SYSTEM REHABILITATION <br /> A mi nimum of a 30-day flow monitori ng system wi 11 begin 12 months after <br /> acceptance of the rehabilitation work has been granted. Flows in each of <br /> the eight mini-systems delineated in the original Sewer System Evaluation <br /> Study I'li 11 be mon i to red. The resul ts of the flow monitoring and a <br /> certification of reduction of flows will be prepared and submitted for TDWR <br /> and EPA review. <br />