My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1984-049
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1984
>
Res 1984-049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2007 2:41:40 PM
Creation date
9/4/2007 2:41:40 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1984-49
Date
5/29/1984
Volume Book
66
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> to provi de further protecti on for Owner agai nst defects and <br /> deficiencies in the work, but the furnishing of such Resident <br /> Project Representation will not make Engineer responsible for <br /> construction means~ methods, techniques, sequences or <br /> procedures or for safety precautions or programs or for <br /> Contractor failure to perform the construction work in <br /> accordance with the Contract Documents. <br /> g. Operations and Maintenance Manual: The Engineer shall <br /> prepare an Operations and Maintenance Manual. <br /> h. Final Plan of Operation: The Engineer shall prepare a Final <br /> Plan of Operation. <br /> i. P roj ect Performance Servi ces: The Engineer shall provide <br /> project performance servi ces as required by the TDWR and <br /> EPA to certify whether the sewer system rehabil itation work <br /> has resulted in a reduction of wet-weather flows similar to <br /> that estimated in the Sewer System Evaluation Study, as <br /> described in Attachment C. <br /> j. Subsurface Investigations and Laboratory Tests: The Engineer <br /> wi 11 provide the Owner with advice, when requested, with <br /> respect to the making of all subsurface investigations, <br /> including borings~ test pits, soil resistivity surveys, and <br /> other subsurface exp1 orati ons; however~ the making of such <br /> investigations and the interpretations of data and reports by <br /> special consultants are not a part of the services to be <br /> rendered by the Engineer, and the cost therefor shall be <br /> paid by the Owner. The Engineer shall monitor and review the <br /> work of testing laboratories and inspection bureaus required <br /> for the testi ng or inspection of materi a 1 s, etc., for the <br /> Project, but the cost of such laboroatory tests or inspection <br /> shall be paid by the Owner. <br /> k. Topographic~ Ri ght-of-Way ~ and Land Surveys: The Engineer <br /> shall make topographic surveys only when necessary 1 n <br /> connection with the location and design of all structures and <br /> lines. The Engineer will i ndi cate to the Owner the <br /> approximate boundaries of land which may be required for the <br /> Project. Surveys for the procurement of land and services in <br /> con necti on with proceedi ngs for the condemnati on are not a <br /> part of the contract. The Owner shall pay for costs of land <br /> surveys and shall compensate the Engineer for services <br /> rendered in connection with condemnation proceedings. <br /> 1. Additi anal Services: The Engineer shall perform such <br /> additional services as requested and authorized in writing by <br /> the Owner. <br /> 3. Compensation to Engineer: The Owner agrees to pay the Engi neer <br /> for all professional servi ces rendered under thi s Contract in accordance <br /> with the following: <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.