Laserfiche WebLink
<br /> -7':'" <br /> paid together with any permit fees required <br /> for the Plumbing Permit prior to the issuance <br /> of the Plumbing Permit. The building <br /> inspection official or his designated <br /> representative shall not issue a Plumbing <br /> Permit until the payment of the CRFN charged <br /> hereunder is made. All CRFN paid to the <br /> building inspection official or a designated <br /> representative shall be deposited into the <br /> special account created and maintained under <br /> Section 30-49 hereof. <br /> Section 30-47. CRFN Derivation and Appeal <br /> 1. When in the determination of the Public Works <br /> Director or his designated representatives, a <br /> new Structurer Remodeling or Addition is not <br /> included within any category of uses set out <br /> in Section 30-45r prior to issuance of -the <br /> Plumbing Permit the Director of Public Works <br /> or his designated representative shall derive <br /> the Living Unit Equivalent for the proposed <br /> use. Said derivation shall be made utilizing <br /> the average daily water consumption of <br /> similar structures and/or uses for the <br /> previous 12-month period. If a similar use <br /> and/or structure does not exist at the time <br /> of request for a Pl umbing Permit the Living <br /> Uni-t Equivalent shall be derived as in <br /> Section 30-48 of this Ordinance. <br /> 2. An applicant may pay under protest the CRFN <br /> charged by the Director of Public Works and <br /> appeal such charge as provided in this <br /> subsection. Upon payment of the CRFN under <br /> protest, the Plumbing Permit shall be issued <br /> as if no appeal were taken. If upon final <br /> hearing and determination of the appealed <br /> matter by the Council it is found that the <br /> party overpaid, the party will be refunded <br /> the amount overpaid. If the party underpaid <br /> the CRFNr any deficiency will be due to the <br /> City 10 days after final determination and <br /> notice of the amount of deficiency. No final <br /> occupancy permit otherwise known as a <br /> certificate of occupancy shall be issued <br /> until payment of such deficiency. <br /> 3. An applicant for Plumbing Permit or the owner <br /> of the property or such party's <br /> representative has the right to appeal to the <br /> City Councilr by delivery of written notice <br /> duly verified and submitted at least five (5) <br /> working days before next Council meeting to <br /> the City Secretary the CRFNr if the grounds <br /> for such appeal are based on: <br /> ( a) the use designation of the Structure <br /> pursuant to Section 30-44; and/or <br /> (b) the numerical considerations or <br /> determinations of the LUE Factors used in <br /> computing the CRFN pursuant to Section <br /> 30-45 or Section 30-47. <br />