Laserfiche WebLink
<br /> Letter to Dr. Glen Longley <br /> Dated August 27, 1984 <br /> Page Two <br />3. Water Table Map <br /> The water levels in wells around San Marcos will be measured <br /> to better define the flow paths of groundwater to the springs. <br /> The water level in ten wells will be monitored and compared to <br /> past measurements to determine the effect of the drought on <br /> local water table conditions. <br />4. Location Map of Sinkholes, Caves, and Other Recharge Fbints <br /> A detailed field investigation will be made to loca te the <br /> position of sinkholes, caves, open fractures, and minor and <br /> major stream pathways that may act as recharge points. <br />5. Thickness Map of Edwards Aquifer Cover <br /> Using drillers' well logs and geologic information, a map will <br /> be made showing the general thickness of rocks overlying the <br /> Edwards Aquifer. <br />6. Geology Map <br /> A map corrbining the existing geologic information will,be <br /> compiled and drawn at a scale to match the other proposed maps. <br />7. Map of First-order Basins for the Purgatory and Sink Creek Basins <br /> A map outlining the drainage area of first-order basins <br /> feeding into the Purgatory and Sink Creek basins will be made <br /> from topographic maps to show avenues of storm water runoff <br /> that sink in environmentally sensitive areas around San <br /> Marcos. <br />8. Perform dye traces to better define groundwater flow pa ths. <br />9. written discussion on the implica tions of spring and well <br /> water chemistry on groundwater occurrence and movement. <br />The study area is shown on the map which is attached hereto and <br />incorporated herein for all purposes. The duration of the study is <br />agreed to not exceed 145 days from the date of execution by both <br />parties; however, preliminary maps and a preliminary draft of the <br />Report will be delivered to the Ci ty 's Director of Environment and <br />Engineering one hundred fifteen (1l5) days into the contract period for <br />review and cormœnt. Final maps will be delivered to said Director at <br />the expiration of said l45-day period. The final Report, including any <br />changes or amendments to the maps or preliminary Report as recomrœnded <br />by the Ci ty, or by the Edwards Research and Data Center, shall be <br />delivered to said Director within sixty (60) days after the <br />expiration of the above referenced l45-day period. <br />