Laserfiche WebLink
SECTION 3. Chapter 1, Development Procedures, Article 7, Watershed Protection <br />Plans, Section 1.7.1.4, Processing of Application and Decision, subsection (a)(1), is amended to <br />read as follows: <br />(a) Decision by Type of Watershed Protection Plan. An application for <br />approval of a Watershed Protection Plan, Phase 1 and Phase 2, initially shall be <br />decided by the Engineering Director, except where the application is accompanied <br />by any of the following requests, in which case the application shall be construed <br />as an application for a Qualified Watershed Protection Plan, which shall be <br />decided by the Planning and Zoning Commission following a recommendation by <br />the City Engineer: <br />(1) A petition for a variance from water quality and stormwater <br />standards under Section 1.7.1.6; <br />SECTION 4. Chapter 1, Development Procedures, Article 8, Site Preparation Permits, is <br />amended by adding a new Section 1.8.1.8 to read as follows: <br />Section 1.8.1.8 Completion and Acceptance <br />(a) Prior to Occupancy. All improvements required by the Site <br />Preparation Permit must be completed in accordance with applicable regulations <br />and standards prior to the issuance of a certificate of occupancy for the last <br />building on the site. If the construction of any improvement is to be deferred until <br />after the issuance of a certificate of occupancy, the property owner shall first <br />provide sufficient security to the City in the form of a cash escrow or other form <br />acceptable to the City to ensure completion of the improvements. This section <br />shall not be construed to authorize the issuance of a certificate of occupancy for a <br />structure that does not comply with the requirements of any building codes <br />adopted under Chapter 14 of the San Marcos City Code, as amended. <br />(b) Prior to Final Acceptance The property owner shall submit to the <br />City an Engineer's Letter of Concurrence certifying that all stormwater detention <br />and water quality management facilities required under the Site Preparation <br />Permit are in conformance with the approved plans and specifications before the <br />City finally accept such facilities. <br />SECTION 5. Chapter 5, Environmental Regulations, Article 1, General Provisions, <br />Section 5.1.1.1, Applicability, Exceptions, Authority and Findings, is amended to read as <br />follows: <br />5.1.1.1 Applicability, Exceptions, Authority and Findings <br />(a) Applicability. <br />(1) The standards of this Article apply to the development of all land <br />within the City limits and within the City's extraterritorial <br />