My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1984-103
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1984
>
Res 1984-103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2007 6:37:26 PM
Creation date
9/4/2007 6:37:25 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1984-103
Date
11/5/1984
Volume Book
68
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Completion for a part or parts of the project or the <br /> project as a whole, submit to Contractor, Engineer, and <br /> Director a list of observed items requiring correction. <br /> b. Conduct final inspection in the company of Eng ineer , <br /> Director, OÑner and Contractor and prepare a final list of <br /> items to be corrected, and transmit said list <br /> to Engineer and Director. <br /> c. Verify that all items on tentative final lists have been <br /> corrected and make recommendations to Director and Engineer <br /> concerning acceptance. <br /> C. LUlITATIONS OF AUTHORITI <br /> Except upon written instructions of Director, Resident Project <br /> Eng i neer: <br /> 1. Shall not authorize any deviation from the Contract Docu~ents <br /> or approve any substitute materials or equipment. <br /> 2. Shall not undertake any of the responsibilities of Contractor, <br /> subcontractors or Contractor's superintendent. <br /> 3. Shall not expedite Work for the Contractor. <br /> 4. Shall not advise on or issue directions relative to any aspect <br /> of the means, methods, techniques, sequences or procedures of <br /> construction unless such 1S specifically called for in the <br /> Contract Docu~ents. <br /> 5. Shall not advise on or issue directions as to safety <br /> pcecautions on prcgrams 1n connection with the hbrk. <br /> 6. Shall not authorize Owner to occupy the Project in whole or 1n <br /> part. <br /> 7. Shall not participate in specialized field or laboratory tests. <br /> A-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.