Laserfiche WebLink
<br /> CHANGE OR EXTRA WORK ORDER <br />PROJECT: Interim Package Wastewater Treatment System <br />CONTRACT: CSM 84-1249 <br /> SAM 84-595-32 <br />OYVNER: City of San Marcos <br />CONTRACTOR: Lambco, I nc . <br />CHANGE ORDER NO. 3 DATE: 11 /8/84 <br /> CHANGE OR EXTRA WORK TO BE PERFORMED <br />Add the following items and costs for changing 16 inch outfall piping <br />to 24 inch: <br />1 each, 24" Plugg 150.00 <br />1 each, 24" R.C.P. Stub out of Manhole <br />for Future Outfall Connection 800.00 <br />2 each, 24" X 16" D. LP. Wyes 4,285.00 <br />1222 LF, 24" D.LP. @ $52.30/Ft. 63,878.00 <br />1 each, 6' Diameter Manhole for Manhole #4 <br />with 3, 24" Pipe Connections as indicated on <br />Plant Sheet 3 of 9. 1,950.00 <br /> TOTAL ADDED $ 71,063.00 <br />Deduct the following items and costs for changing 16 inch Outfall Piping <br />to 24 inch and omitting Outfall Piping and Structure from Station 0+00 <br />through 1+46 from Contract: <br />1222 LF, 16" D.LP. @ $31.00/ft. 37,882.00 <br />1 each, 5' Manhole 1 ,300.00 <br />2 each, 16" X 16" Wyes 1,980.00 <br />118 LF, 24" D.LP. @ $52.30/ft. 6,178.00 <br />29 LF. C.G.M.P. and Outfall Structure 1,740.00 <br />1 each, 16" Clean Out 800.00 <br /> TOTAL DEDUCT ($49,880.00) <br />