My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2007-161
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2007
>
Res 2007-161
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2008 2:50:58 PM
Creation date
9/5/2007 4:29:39 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2007-161
Date
9/4/2007
Volume Book
173
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />approves of the cost estimate provided by the Post Road Project Engineer. Accordingly, Carma <br />has directed the Post Road Water Project Engineer to design the Post Road Project to incorporate I <br />the 24" water main oversizing requested by the City. <br /> <br />3. Engineer's Services. Carma will ensure that all construction work on the Post Water <br />Road Project is performed under the supervision and oversight of the Post Road Project <br />Engineer, including the following: <br /> <br />A. <br /> <br />The Post Road Water Project Engineer will coordinate the design and <br />construction of the Post Road Water Project with the City. <br />The Post Road Water Project Engineer will prepare plans and specifications for <br />the Post Road Water Project in accordance with City design and construction <br />standards and with applicable laws and regulations, and submit them to the City <br />for review. The Post Road Water Project Engineer will assist Carma in obtaining <br />all necessary permits for the Post Road Project from authorities having <br />jurisdiction over the work. (including but not limited to the City and railroad <br />company). <br />The Post Road Water Project Engineer will perform periodic inspections of work <br />on the Post Water Road Project in progress at least monthly throughout the <br />construction period, and will coordinate the inspections with the City's <br />Department of Environment and Engineering. <br />The Post Road Water Project Engineer will conduct inspections to determine the <br />dates of substantial completion and final completion for the Post Road Water <br />Project, and make a written recommendation to the City regarding the acceptance <br />of the Post Road Project. <br /> <br />I <br /> <br />B. <br /> <br />C. <br /> <br />D. <br /> <br />4. Construction. Carma will ensure that the construction of the Post Road Water <br />Project is performed in accordance with the following: <br /> <br />E. <br /> <br />A. <br /> <br />Carma will obtain the City's approval of the contractor to be used for the <br />construction. <br />Carma will required the contractor to obtain a performance bond and a payment <br />bond in the full amount of the construction contract from the contractor, naming <br />Carma and the City as obligees. <br />Carma will require the contractor to maintain commercial general liability <br />insurance coverage for all of its operations and those of its subcontractors, and all <br />persons engaged in work on the site must be covered by workers' compensation <br />Insurance. <br />Carma will cause all necessary licenses and permits for the Post Road Water <br />Project to be obtained from authorities having jurisdiction over the work <br />(including but not limited to the City and railroad company), and pay all fees <br />related to such permits. <br />Carma will require the contractor to construct the Post Road Water Project in a <br />good and workmanlike manner and in accordance with the plans and <br />specifications for the facilities prepared by the Post Road Water Project Engineer. <br /> <br />I <br /> <br />B. <br /> <br />C. <br /> <br />D. <br /> <br />Post Road Water Utility Agt 20070614a <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.