My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2014-050/Transmission Planning Data Services Agreement with ERCOT and LCRA
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2014
>
Res 2014-050/Transmission Planning Data Services Agreement with ERCOT and LCRA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 3:44:17 PM
Creation date
4/22/2014 8:46:40 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2014-50
Date
4/15/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Handbook for Planning Data Services <br />9. Special Protection Systems (SPSI <br />Description: <br />Section 6.2.2 of the ERGOT Nodal Operating Guides provides SPS requirements for <br />ERGOT, Transmission Operators, and TDSPs. To meet the requirements of Section <br />6.2.2, LCRA and Owners will perform the following requirements, according to the <br />appropriate ownership scenario: <br />Owner Shall: <br />1. Design the SPS. <br />2. Coordinate the design of the SPS with the owners and operators of facilities included <br />in the SPS. <br />3. Create the SPS documentation as required by ERGOT detailing the design, <br />operation, functional testing, coordination of the SPS with other protection and <br />control systems and SPS exit plan. <br />LCRA Shall: <br />1. Submit documentation of the SPS to ERGOT for review and compilation into an <br />ERGOT SPS database. <br />2. Send ERGOT acknowledgement of receipt of data to Owner. <br />Reference: <br />• Section 6.2.2 of the ERGOT Nodal Operating Guides <br />141 P 19, 11 ev, 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.