My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07091985 Emergency Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
1980 s
>
1985
>
07091985 Emergency Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2006 3:04:16 PM
Creation date
12/2/2003 4:53:14 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Emergency Meeting
Date
7/9/1985
Volume Book
71
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />109 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MINUTES OF THE EMERGENCY MEETING OF THE <br />CITY COUNCIL OF THE CITY OF SAN MARCOS, <br />TEXAS, JULY 9, 1985 <br /> <br /> <br />PRESENT: Mayor Emmie Craddock <br /> <br />Council Members Karl W. Brown <br />Bill Coddington <br />Gerald G. Farr <br />* Fred Guerra <br />Betty Jane Kissler <br />William C. Nicola <br /> <br />City Manager A. C. Gonzalez <br />City Secretary Janis K. Womack <br />City Attorney Lamar W. Hankins <br />Director of Public Works George Boeker <br />Director of Env. and Engineering Steve Jenkins <br />Assistant City Manager Robert T. Herrera <br />Also Present: Russell Scott and others. <br /> <br />Mayor Craddock called the meeting to order at 5:00 p.m. <br /> <br />Mayor Craddock introduced for consideration approval of direction to <br />Staff regarding the rehabilitation of the Sessom wastewater line. <br />The Council held a discussion regarding engineers the City is pre- <br />sently using (Freese and Nichols, Black and Veatch) they would consider <br />for design work for the slip lining phase of the Sessom line rehabili- <br />tation. City Manager Gonzalez stated if the Council did not wish to <br />proceed immediately with a portion of the rehabilitation, there would <br />be no pressure to go through the bidding process and possibly even to <br />delay the construction phase until next summer. After much discussion, <br />Mr. Farr moved the City proceed with the slip lining portion of <br />Phase I as a separate project and Mr. Nicola seconded the motion. <br />On roll call the following vote was recorded: <br /> <br />AYE: Brown, Farr, Craddock, Kissler, Nicola. <br /> <br />NAY: Coddington. <br /> <br />ABSTAIN: None. <br /> <br />The meeting adjourned at 5:20 p.m. on motion made by Ms. Kissler and <br />seconded by Mayor Craddock. <br /> <br />LCQ <br /> <br />Emml.'..í" raddoc k...'.. <br /> <br />May/; ~ ~. ~/ <br />í / <br />!" /// <br />Bill Coddington ~ <br />Council Member <br /> <br /> <br />Kissler <br />Council Member <br /> <br /> <br />William <br />Council <br /> <br /> <br />ATTES~ ~DðJ <br /> <br />':1:: K. Womack <br />City Secretary <br /> <br />* Mr. Guerra was not present at this meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.