My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2007-163
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2007
>
Res 2007-163
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2008 2:50:45 PM
Creation date
9/19/2007 9:35:40 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2007-163
Date
9/18/2007
Volume Book
173
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />and state agencies havmg JurisdIctIOn over the Project in order to revIew Project coordmation, I <br />reqUIred procedures, the Contractor's general work plan, construction schedule, reqUIrements for <br />the Project and to Identify key representatives of the parties and lines of commumcatlOn. The <br />Engineer will be responsible for keep accurate mmutes of thIS meeting or otherwise record the <br />results of this conference. <br /> <br />1.4.10 ASSIst the CIty in ensunng that all applicable permits and approvals have been obtained <br />from the appropriate agencies prior to construction. <br /> <br />1.4.11 Make on-site mspections of the Project at least monthly to ensure falmlianty with the <br />progress and quality of the work, to detennine if the work is proceeding in acceptable <br />confonnance with the construction contract documents, and to review the work WIth the CIty's <br />designated representatives. On the baSIS of such on-site inspections by the Engineer, the <br />Engmeer WIll keep the CIty infonned of the progress and quahty of the work through wntten <br />status reports and through meetings WIth the City's representative; and will also be reasonably <br />available to perfonn site VIsitations at the speCIfic request of the CIty by the next business day <br />after a request is made. The ConstructIOn schedule IS estimated to be 18 weeks from the date of <br />construction contract award. <br /> <br />1.4.12 Not have control or charge of and wIll not be responsible for construction means, <br />methods, techniques, sequences or procedures, or for safety precautions and programs m I <br />connectIOn with the work, for the acts or omISSIOns of the Contractor, subcontractors or any other <br />persons perfonning any of the work, or for the faIlure of any of them to carry out the work in <br />accordance with the construction contract documents unless such acts or omissIOns are due to the <br />negligence of the Engineer or are acts or omissions under the Engineer's control. However, <br />Engineer will exercise its authority on behalf of City in accordance herewith and particularly <br />during the construction phase so that all work perfonned by the Contractor results in a Project <br />completed in accordance WIth the construction contract documents, and during any phase should <br />the Engineer become aware of the Contractor's utIlization of means, methods, techniques, <br />sequences and/or procedures of construction whIch, in Engineer's opinion, will not result in <br />completIOn of the ProJect in accordance with the constructIOn contract documents; or which are <br />unsafe, Engineer will immediately infonn the CIty and will take all necessary actIOn which the <br />Engmeer IS authonzed under this Agreement to take to correct the matter. <br /> <br />lA.13 At all times have access to the work wherever it is m preparatIOn or progress. <br /> <br />1.4.14 Detenmne the amounts owmg to the Contractor based on its on-site professional <br />mspections and on evaluations of the Contractor's applicatIOns for payment including <br />comparisons of Contractor's monthly cost reports WIth ItS apphcations for payment, and will <br />make recommendations for payment in these amounts, as provided in the construction contract <br />documents, or take such other appropriate action whIch the Engmeer deems necessary. <br /> <br />1.4 .15 Make recommendations for payment that constitute a representation by Engineer to the <br /> <br />I <br /> <br />CEC - Quail Run Waterline Agreement <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.