Laserfiche WebLink
<br /> ( were <br /> Inc.) <br /> was the on of a prellminary gn <br /> water ,with on and <br /> ng the lit over the anning peri A computer-based <br /> system modeJ was and Nichols, Inc. determine the <br /> minimum line si wen and pump ti ground <br /> and their locations and saf e ope rat pressures <br /> flows throughout the <br /> The eighth and final determination of <br /> J on to proposed MUDs. imates <br /> were prepared on unit Jity components do 1 Jars. <br /> ng of 10% ion were <br /> City and proposed MUDs were i ned on <br /> s three planning peri <br /> are in the attached report <br /> are in <br /> Table 4. Estimated Total Construction Costs <br /> MUD 1 144;540 4; 111 ,340 <br /> Hlghrldge MUD 1 1.760,460 <br /> San Marcos 1,649,610 <br /> <br /> 3 ,200 5;544;610 8,066,910 17,454.720 <br /> * An costs are in 1 <br />