Laserfiche WebLink
<br /> land uses represent <br /> medium, <br /> industrial land uses represent 5 acre <br /> area were generated for <br /> I I I and <br /> and ul land use buí Idout <br /> schedules. <br /> 1he and planning <br /> <br /> horizon and are presented <br /> A preHminary design HUes) including <br /> <br /> was prepared in order the <br /> planning plan two gravity interceptors serv1ng <br /> both IH and a combined <br /> treatment and <br /> <br /> the areas west and wUh1n the North ¡ <br /> as the area to the south of the Municipal Airport The proposed treatment <br /> plant site vicinity of the munic1pal airport on the unnamed <br /> of the San Marcos River at tached map). <br /> Construct 10n were calculated for lity. <br /> estimates were based on una costs for faciHty components in 1985 <br /> Cont ingency costs of 15% and engineering costs of 1 O~ construction were <br /> included. The and estimated construction for <br /> the 1 are presented Tables <br /> and <br /> added of constructing paraHel <br /> wastewater treatment 1 <br /> 1 <br /> serving the Sink Creek basin and south <br /> wastewater treatment plant are to be <br /> these areas <br /> jet mains. <br />