Laserfiche WebLink
required, or an alternative method of securing the needed right of way. When <br />enforcing subdivision regulations in the City's ETJ, the City shall facilitate the <br />County's road maintenance program by requiring a road standard no less than <br />the standards set out in Attachment A. <br />5. The County expressly delegates to the City the authority, in accordance with <br />the County's subdivision regulations, to require the preparation of a <br />subdivision plat for the division of any property into two or more lots if any <br />lot in the subdivision is 10 acres or less in size. <br />6. The City shall deliver two copies of all recorded plats for subdivisions within <br />the City's ETJ to the County within ten (10) working days of the recording of <br />the subdivision plat. The City shall also provide to the County a digital file of <br />each subdivision plat, including at least two ground control GPS points in a <br />format approved by the County. <br />7. The City shall confer with the Caldwell County 911 Addressing Division or <br />the County's designated representative concerning street names prior to final <br />plat approval. <br />8. The City shall allow County inspectors access to road construction sites of <br />subdivisions within the ETJ, and the City shall timely submit copies of all <br />road design materials and road construction test results to the County during <br />%1 <br />