My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2014-137/Kimley-Horn Professional Engineering Services Contract for Crystal Clear CCN waterline projects
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2014
>
Res 2014-137/Kimley-Horn Professional Engineering Services Contract for Crystal Clear CCN waterline projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 4:02:32 PM
Creation date
10/13/2014 10:25:15 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2014-137
Date
10/6/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROFESSIONAL ENGINEERING SERVICES AGREEMENT <br />This Agreement is effective O r t n h P r 6. 9014 between the City of <br />San Marcos, Texas, a home -rule municipal corporation, (the "City "), 630 East Hopkins, San <br />Marcos, Texas 78666 and Kimley -Horn and Associates, Inc. (the "Engineer "), 601 NW Loop <br />410, Suite 350, San Antonio, TX 78216, for the Engineer's provision of professional <br />engineering services in connection with the Crystal Clear CCN Water Line Improvements <br />Project (the "Project "). <br />The City and the Engineer agree as follows: <br />ARTICLE 1 <br />ENGINEER'S SERVICES AND STANDARD OF PERFORMANCE <br />A. The term of this Agreement begins on the effective date established above and will end <br />upon the Engineer's completion, and the City's acceptance of all services included in this <br />Agreement. The Engineer agrees to provide the City with the services described in Attachment <br />A, Scope of Services, which is incorporated herein by reference for all intents and purposes, and <br />which services may be more generally described as follows: design of water line extensions and <br />sidewalk improvements at three locations within the City. <br />B. The Engineer understands that time is of the essence and agrees to provide all design <br />work and professional services in the most expedient and efficient manner possible in order to <br />complete the Project by: August 11, 2015 in accordance with the approved Project schedule <br />included in this Agreement as Attachment B. <br />C. The Engineer will not subcontract any work under this Agreement without prior written <br />approval from the City. In the event approval is given by the City, the Engineer will specify the <br />appropriate insurance requirements and miscellaneous provisions by separate written agreement <br />with the subcontractor. <br />D. The Engineer will perform all of its services in coordination with the City. The Engineer <br />will advise the City of data and information the Engineer needs to perform its services and the <br />Engineer will meet with City representatives at mutually convenient times to assemble this data <br />and information. <br />E. V. Ryan Sowa, P.E. is the Engineer's Project Representative assigned to this Project. <br />The Engineer will not substitute another representative for this Project unless approved in <br />writing by the City in advance of such proposed substitution. In the event the City and the <br />Engineer cannot agree to the substitution of the Project Representative, the City may terminate <br />this agreement. <br />F. The City will designate and notify the Engineer of its designation of an authorized Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.