|
VEGETATION CONTROL, DEBRIS REMOVAL, AND LANDSCAPE MAINTENANCE
<br />FOR SAN MARCOS FY2015
<br />Description
<br />PROPOSED
<br />FY2015
<br />Cycles
<br />Square Feet
<br />Proposed Rate
<br />Total Amt
<br />Downtown Alleys mow, trim, and
<br />litter pickup
<br />12
<br />176,208.00
<br />$
<br />0.00450
<br />$
<br />9,515.23
<br />SMCISD ROW's mow, trim, and
<br />litter pickup
<br />6
<br />183,696.20
<br />$
<br />0.00450
<br />$
<br />4,959.80
<br />City Wide Alleys /ROW's -- mow,
<br />trim and litter pickup
<br />5
<br />7,534,216.00
<br />$
<br />0.00450
<br />$
<br />169,519.86
<br />City lots -- mow, trim and litter
<br />pickup
<br />10
<br />307,184.00
<br />$
<br />0.00450
<br />$
<br />13,823.28
<br />Craddock Medians -- mow, trim,
<br />and litter pickup
<br />10
<br />104,999.50
<br />$
<br />0.00450
<br />$
<br />4,724.98
<br />City Property behind Sam's Club
<br />Mow
<br />4
<br />(acre) 36.6
<br />$
<br />16.00
<br />$
<br />2,342.40
<br />City Wide drainage / easement
<br />mow, trim and litter pickup
<br />4
<br />4,421,556.14
<br />$
<br />0.01683
<br />$
<br />297,659.16
<br />City Wide Flowerbeds (billed by
<br />the man -hour )
<br />$
<br />16.00
<br />$
<br />14,219.36
<br />Athletic Fields mow and trim
<br />66
<br />989506.00
<br />$
<br />0.000525
<br />$
<br />34,286.38
<br />Downtown Sweeping (billed by
<br />the man -hour )
<br />$
<br />16.00
<br />$
<br />30,400.00
<br />Litter pickup @ Rio Vista Dam
<br />billed by the man -hour
<br />$
<br />21.00
<br />$
<br />20,160.00
<br />S.M. Roadway area litter pickup
<br />acre
<br />12
<br />acre 71.78
<br />$
<br />12.00
<br />$
<br />10,336.32
<br />McCarty Lane -- mow, trim, and
<br />litter pickup, flowerbed
<br />6
<br />430000.00
<br />$
<br />0.00360
<br />$
<br />9,288.00
<br />Wonder World -- mow, trim, and
<br />litter pickup
<br />2
<br />1610400.00
<br />$
<br />0.00360
<br />$
<br />11,594.88
<br />IH35 -- mow /trim inside city limits
<br />7
<br />11325600.00
<br />$
<br />0.000500
<br />$
<br />39,639.60
<br />IH35 litter pickup -- inside city
<br />limits
<br />10
<br />11325600.00
<br />$
<br />0.000238
<br />$
<br />26,954.93
<br />IH 35 Intersections -- mow, trim,
<br />and litter pickup
<br />4
<br />1502000.00
<br />$
<br />0.00263
<br />$
<br />15,801.04
<br />Neighborhood Parks -- mow,
<br />trim, and litter pickup
<br />18
<br />$
<br />3,475.00
<br />$
<br />62,550.00
<br />FY2015 Total
<br />$
<br />777,775.22
<br />
|