My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2007-202
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2007
>
Res 2007-202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 4:41:37 PM
Creation date
11/21/2007 9:22:10 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
Number
2007-202
Date
11/20/2007
Volume Book
173
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
equivalent match project in return for a waiver of the local match fund participation requirement on the <br />approved federal off - system bridge PWP not yet awarded: <br />PART 2. In receiving this waiver the Local Government acknowledges its obligation to <br />conform with all conditions of 43 TAC 15.55(d). These conditions include but are not limited to the <br />following: <br />• The Local Government must be currently in compliance with load posting and closure <br />regulations as defined in the National Bridge Inspection Standards under US Code of <br />Federal Regulations, Title 23, Section 650.3033. <br />• The equivalent match project work increases the load capacity of the existing bridge or <br />other mainlane cross - drainage structure, or upgrades the structure to its original load <br />capacity with a minimum upgrade to safely carry school bus loading if located on a <br />school bus route. <br />• In performing or causing to be performed, the equivalent match project the Local <br />Government assumes all responsibilities for engineering and construction, and <br />complying with all applicable state and federal environmental regulations and <br />permitting requirements for the structures being improved. <br />• The work on the proposed equivalent match project has not begun and will not begin <br />until the local match fund participation waiver approval process has been completed. <br />• The Local Government will be allowed three years after the contract award of the PWP <br />to complete the structural improvement work on the equivalent -match project. <br />• Should this waiver be approved an appropriate written agreement or amendment to a <br />previously executed agreement will be executed between the State and the Local <br />Government. <br />PART 3. That this Resolution shall be in full force and effect from and after its passage <br />and will remain in effect unless subsequently repealed or otherwise amended. <br />2 <br />DESCRIPTION OF <br />STRUCTURAL <br />ON SCHOOL BUS <br />IMPROVEMENT <br />LOCATION <br />ROUTE <br />WORK <br />ESTIMATED COST <br />McCarty Lane at <br />Replace existing 30" <br />Cottonwood Creek <br />Yes <br />CMP culverts with <br />$249,375.00 <br />Crossing (Exhibit A <br />10'6' RBC <br />and Exhibit B) <br />PART 2. In receiving this waiver the Local Government acknowledges its obligation to <br />conform with all conditions of 43 TAC 15.55(d). These conditions include but are not limited to the <br />following: <br />• The Local Government must be currently in compliance with load posting and closure <br />regulations as defined in the National Bridge Inspection Standards under US Code of <br />Federal Regulations, Title 23, Section 650.3033. <br />• The equivalent match project work increases the load capacity of the existing bridge or <br />other mainlane cross - drainage structure, or upgrades the structure to its original load <br />capacity with a minimum upgrade to safely carry school bus loading if located on a <br />school bus route. <br />• In performing or causing to be performed, the equivalent match project the Local <br />Government assumes all responsibilities for engineering and construction, and <br />complying with all applicable state and federal environmental regulations and <br />permitting requirements for the structures being improved. <br />• The work on the proposed equivalent match project has not begun and will not begin <br />until the local match fund participation waiver approval process has been completed. <br />• The Local Government will be allowed three years after the contract award of the PWP <br />to complete the structural improvement work on the equivalent -match project. <br />• Should this waiver be approved an appropriate written agreement or amendment to a <br />previously executed agreement will be executed between the State and the Local <br />Government. <br />PART 3. That this Resolution shall be in full force and effect from and after its passage <br />and will remain in effect unless subsequently repealed or otherwise amended. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.