My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2007-208
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2007
>
Res 2007-208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2008 2:43:41 PM
Creation date
12/5/2007 9:35:52 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Adopting
Number
2007-208
Date
12/4/2007
Volume Book
173
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />12. Project Construction Phase <br />A. Estimate percentage of project development and construction dollars to be spent with San <br />Marcos based contractors or sub-contractors. <br />Construction costs $ Percentage local contractors % <br /> <br />B. Construction Employment Estimates: <br />Start Date (MoNr) Completion Date (MoNr) <br />No. of Construction Jobs Estimated Total Construction Payroll $ <br />C. Describe any off-site infrastructure requirements: <br />. Water <br /> <br />. Wastewater <br /> <br />. Streets <br /> <br />. Drainage <br /> <br />. Other <br /> <br />13. Project Operation Phase. Provide employment information for the number of years incentive is <br />requested. <br /> <br /> At Project Start <br /> Existing Date (mo/yr) At Term of <br /> Employment Information Operation / Incentive <br /> -- <br /> (if applicable) <br />A. Total number of <br /> permanent, full-time jobs <br />B. Employees transferred <br /> from outside San Marcos <br />
The URL can be used to link to this page
Your browser does not support the video tag.