Laserfiche WebLink
specifically required for the performance of aDOT-assisted contract, <br />toward DBE goals, provided you determine the fee to be reasonable and <br />not excessive as compared with fees customarily allowed for similar <br />services. <br />d. If the Contractor chooses to assist a DBE firm, other than a manufacturing <br />material supplier or regular dealer, and the DBE firm accepts the assistance, <br />the Contractor may act solely as a guarantor by use of a two-party check for <br />payment of materials to be used on the project by the DBE. The material <br />supplier must invoice the DBE who will present the invoice to the Contractor. <br />The Contractor may issue a joint check to the DBE and the material supplier <br />and the DBE firm must issue the remittance to the material supplier. No funds <br />shall go directly from the Contractor to the material supplier. The DBE firm <br />may accept or reject this joint checking arrangement. <br />The Contractor must obtain approval from the Department prior to <br />implementing the use of joint check arrangements with the DBE. Submit to <br />the Department, Joint Check Approval Form 2178 for requesting approval. <br />Provide copies of cancelled joint checks upon request. No DBE goal credit <br />will be allowed for the cost of DBE materials that are paid by the Contractor <br />directly to the material supplier. <br />e. No DBE goal credit will be allowed for supplies and equipment the DBE <br />subcontractor leases from the contractor or its affiliates. <br />f. No DBE goal credit will be allowed for the period of time determined by the <br />Department that the DBE was not performing a CUF. The denial period of <br />time may occur before or after a determination has been made by the <br />department. In case of the denial of credit for non-performance of a CUF of a <br />DBE, the Contractor will be required to provide a substitute DBE to rr~eet the <br />contract goal or provide an adequate good faith effort when applicable. <br />Records and Reports. <br />a. The Contractor shall submit monthly reports, after work begins, on DBE <br />payments to meet the DBE goal and for DBE or HUB race-neutral <br />participation. Report payments made to non-DBE HUBS. The monthly report <br />is to be sent to the Area Engineer. These reports will be due within 15 days <br />after the end of a calendar month. These reports will be required until all DBE <br />subcontracting or material supply activity is completed. Form No. SMS.4903, <br />"DBE or HUB Progress Report," is to be used for monthly reporting. Form <br />No. SMS.4904, "DBE or HUB Final Report," is to be used as a final summary <br />of DBE payments submitted upon completion of the project. The original final <br />report must be submitted to the Business Opportunity Programs Office and a <br />copy must be submitted to the Area Engineer. These forms may be obtained <br />from the Department or may be reproduced by the Contractor. The <br />Department may verify the amounts being reported as paid to DBEs by <br />requesting copies of cancelled checks paid to DBEs on a random basis. <br />9-11 000---461 <br />02-06 <br /> <br />