My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2014-169/Billing and Collection Services for SM Fire Department - Fire Recovery USA
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2014
>
Res 2014-169/Billing and Collection Services for SM Fire Department - Fire Recovery USA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 4:00:11 PM
Creation date
12/19/2014 11:30:51 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2014-169
Date
12/16/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Gas Detector <br />$40.00 <br />SCBA (each) <br />50.00 <br />SCBA refill (each) <br />10.00 <br />Fire Flappers <br />10.00 <br />Thermal Imaging Camera <br />100.00 <br />Axes <br />12.00 <br />Shovels and scoops <br />15.00 <br />Brooms <br />15.00 <br />FIRE EQUIPMENT (Replacement) <br />PRICE <br />Hose 1" (each 50') <br />$120.00 <br />Hose 1" neoprene (each 50) <br />$220.00 <br />Hose 1.75" (each 50') <br />$125.00 <br />Hose 2.5" (each 50') <br />$175.00 <br />Hose 3" (each 50') <br />$225.00 <br />Hose 5" (each 50') <br />$525.00 <br />SCBA complete <br />$6,800.00 <br />SCBA spare cylinder (45 minute) (each) <br />$1,200.00 <br />12' roof ladder (each) <br />$289.00 <br />14' roof ladder (each) <br />$316.00 <br />16' roof ladder (each) <br />$376.00 <br />24' extension ladder (each) <br />$677.00 <br />10' attic ladder (each) <br />$228.00 <br />A -Frame combo ladder (each) <br />$541.00 <br />Thermal Imaging Camera (each) <br />$13,089.00 <br />Motorola portable radio (each) <br />Fog nozzle 1.5- 1.75" (each) <br />$800.00 <br />Fog nozzle 1.0" (each) <br />$555.00 <br />Fog nozzle 2.5" (each) <br />$900.00 <br />Fog nozzle 2.5" playpipe (each) <br />700.00 <br />Fog nozzle 2.5" master (each) <br />2,500.00 <br />Stacked tips w/ shaper (each) <br />600.00 <br />Deluge monitor w/o pipe and tips (each) <br />3,000.00 <br />Push broom (each) <br />60.00 <br />Shovels (each) <br />60.00 <br />Large Scoop (each) <br />60.00 <br />Note: This list is not all- inclusive of equipment that may be damaged or contaminated during the <br />course of a response effort. Additional equipment that is not herein listed may be charged at actual <br />replacement cost. <br />
The URL can be used to link to this page
Your browser does not support the video tag.