My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-016/City and Klotz Associates for the provision of professional engineering services in connection with the Wallace Addition - Water And Wastewater Improvements Project in an amount not to exceed $136,645.27
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-016/City and Klotz Associates for the provision of professional engineering services in connection with the Wallace Addition - Water And Wastewater Improvements Project in an amount not to exceed $136,645.27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2015 11:43:13 AM
Creation date
2/24/2015 11:24:40 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-16
Date
2/17/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
k I o t z JF.4) a s s o c i a t e s <br />Task 22 — Record Drawings <br />Engineer will prepare an electronic copy (pdf format) of the record drawings. The record <br />drawings will be prepared from information provided by the Contractor and the City Inspector <br />concerning changes made in the field. In addition, Engineer will provide an electronic copy <br />(AutoCAD format) of the final alignment with all appurtenances so that the City can incorporate <br />the improvements Into its GIS system. <br />DELIVERABLES AND SCHEDULE <br />Klotz Associates, Inc. will complete the Scope of Work based on the following schedule of <br />deliverables. <br />30 Percent Drawings —14 weeks after NTP <br />60 Percent Drawings — 3 weeks after receipt of 30 percent comments <br />90 Percent Drawings with draft manual — 3 weeks after receipt of 60 percent comments <br />Final Sealed Drawings and Manual — 3 weeks after receipt of 90 percent comments <br />Bid Phase is anticipated to last three months <br />Construction Phase Is anticipated to last 4 months <br />Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.