Laserfiche WebLink
(1) Stage 1. <br />a. Stage 1 shall be implemented when any one of the following <br />conditions occur, or as otherwise determined by the director: <br />1. The ten -day average aquifer level is less than 660 feet <br />above mean sea level as measured at the J -17 index well; or <br />2. The ten -day average discharge rate of San Marcos Springs <br />is below 96 cfs as measured at the San Marcos gauging <br />station; or <br />3. The ten -day average discharge rate of Comal Springs is <br />below 225 cfs as measured at the Comal gauging station. <br />b. Stage 1 shall be terminated when the conditions in subsection (1) <br />are no longer satisfied, or as otherwise determined by the director. <br />(2) Stage 2. <br />a. Stage 2 shall be implemented when any one of the following <br />conditions occur, or as otherwise determined by the director: <br />1. The ten -day average aquifer level is less than 650 feet <br />above mean sea level as measured at the J -17 index well; or <br />2. The ten -day average discharge rate of San Marcos Springs <br />is below 80 cfs as measured at the San Marcos gauging <br />station; or <br />3. The ten -day average discharge rate of Comal Springs is <br />below 200 cfs as measured at the Comal gauging station. <br />b. Stage 2 shall be terminated when the conditions in subsection (1) <br />are no longer satisfied, or as otherwise determined by the director. <br />(3) Stage 3. <br />a. Stage 3 shall be implemented when any one of the following <br />conditions occur, or as otherwise determined by the director: <br />1. The ten -day average aquifer level is less than 640 feet <br />above mean sea level as measured at the J -17 index well; or <br />