My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-060/Professional Services Agreement between the City and Brown Reynolds Watford Architects, Inc. for the provision of Professional Architectural Services in connection with the San Marcos Fire Station No. 4 project in the not-to-exceed amount of
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-060/Professional Services Agreement between the City and Brown Reynolds Watford Architects, Inc. for the provision of Professional Architectural Services in connection with the San Marcos Fire Station No. 4 project in the not-to-exceed amount of
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2015 11:00:13 AM
Creation date
6/15/2015 1:51:03 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-60
Date
6/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
services. The following services are not anticipated at this time and, if added at the City's request, <br />are specifically considered to be additional services: <br />Architectural <br />a) Kitchen and food vending equipment procurement; <br />b) Furniture and office equipment procurement; <br />c) Professional models and renderings produced outside the basic services for this Project; <br />d) Preparation or assistance with the preparation of multiple bid packages; <br />e) Full time on site construction inspection/observation; <br />Environmental or hazardous materials conditions /issues <br />f) Design for LEED certification; <br />g) Preparation of Signage /Graphic Design; <br />Civil <br />h) Participation in zoning modification(s), including street abandonments, easements, <br />SUPS and PDs; <br />i) Environmental or hazardous materials conditions /issues; <br />j) Off site utilities; <br />k) Off site underground storm drainage engineering; <br />1) Storm water pollutant prevention plan (SWPPP) which is to be performed by the <br />construction contractor; <br />m) Property plat; <br />n) Floodplain studies or floodplain reclamation studies; <br />Mechanical. Plumbine and Electrical <br />o) Building utility bill estimates; <br />p) Technology design and documentation; and <br />q) Acoustical design and documentation; <br />r) Advanced Audio / visual systems <br />s) Advanced Building security systems <br />Environment Assessment Survey <br />t) Phase II and Phase III assessment of the Project site. <br />1.6.2 Each material change (deletion or addition) in the services to be provided by Architect must <br />be authorized by the City on the Authorization of Change in Services form attached to this <br />BRW — San Marcos Fire Station NoA <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.