Laserfiche WebLink
services. The following services are not anticipated at this time and, if added at the City's request, <br />are specifically considered to be additional services: <br />Architectural <br />a) Kitchen and food vending equipment procurement; <br />b) Furniture and office equipment procurement; <br />c) Professional models and renderings produced outside the basic services for this Project; <br />d) Preparation or assistance with the preparation of multiple bid packages; <br />e) Full time on site construction inspection/observation; <br />Environmental or hazardous materials conditions /issues <br />f) Design for LEED certification; <br />g) Preparation of Signage /Graphic Design; <br />Civil <br />h) Participation in zoning modification(s), including street abandonments, easements, <br />SUPS and PDs; <br />i) Environmental or hazardous materials conditions /issues; <br />j) Off site utilities; <br />k) Off site underground storm drainage engineering; <br />1) Storm water pollutant prevention plan (SWPPP) which is to be performed by the <br />construction contractor; <br />m) Property plat; <br />n) Floodplain studies or floodplain reclamation studies; <br />Mechanical. Plumbine and Electrical <br />o) Building utility bill estimates; <br />p) Technology design and documentation; and <br />q) Acoustical design and documentation; <br />r) Advanced Audio / visual systems <br />s) Advanced Building security systems <br />Environment Assessment Survey <br />t) Phase II and Phase III assessment of the Project site. <br />1.6.2 Each material change (deletion or addition) in the services to be provided by Architect must <br />be authorized by the City on the Authorization of Change in Services form attached to this <br />BRW — San Marcos Fire Station NoA <br />14 <br />