My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-083/approving an Interlocal Agreement with Texas State University that provides for joint participation in the cost of professional engineering services provided by Espey Consultants Inc., dba RPS for the Water Reuse Expansion Project as well as
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-083/approving an Interlocal Agreement with Texas State University that provides for joint participation in the cost of professional engineering services provided by Espey Consultants Inc., dba RPS for the Water Reuse Expansion Project as well as
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2015 10:43:46 AM
Creation date
8/3/2015 3:07:29 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-83
Date
7/21/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A <br />Total Proiect Design Cost <br />Total Project Design Cost (Pipeline and Reservoir) $824,742 <br />Reservior Design Cost $256,781 <br />Pipeline Design Cost $567,961 <br />Adjusted Design Cost based on TWD13 Financing <br />Percentage of Reservior Design Cost 31.13% <br />Percentage of Pipeline Design Cost 68.87% <br />Total TWDB Financing $401,915 <br />Adjusted Rerservoir Design Cost $125,135 <br />Adjusted Pipeline Design Cost $276;780 <br />Peak Demand (Reservoir) ILA (Pipeline) Percentages <br />($256,781/$824,742) *(100) <br />($567,961/$824,742) *(100) <br />Texas State Reservoir Cost $15,266 ($127,652 *12.2%) <br />12.2% Based on Peak Demand <br />Texas State Pipeline Cost <br />With EAA, Tx State, COSM ILA (16.7 %) $46,222 [($65,275/$391,812) *(100) = 16.7 %] * [$276,780] <br />Texas State Total Design Share $61,489 ($15,574 + $47,152) <br />Direct Water Reuse Feasibility Study Construction Cost Estimate Texas State Construction Share <br />Phase I Pipline (Appendix B.1) $3,128,400 <br />Phase 11 High Service Pump (Appendix B.2) $239,500 <br />Total $3,367,900 <br />$1,942,736.40 ($3,128,400)x(62.1 %) <br />$148,729.50 ($239,500)x(62.1 %) <br />$2,091,466 <br />Texas State Total Construction Share $2,091,466 <br />Construction percentage (62.1 %) per Resolution 2013- 161(a)R for Phase I and II <br />Texas State Total Design and Pipeline /Pump Construction Cost $2,152,955 ($61,489) +($2,091,466) <br />
The URL can be used to link to this page
Your browser does not support the video tag.