Laserfiche WebLink
1.3.2 Residential and Multi-Family Single Stream Collection <br /> A. The Contractor will collect the following Recyclable Materials from each Residential Unit in the <br /> contract area on a one time every-other-week basis and from each Multi-Family Unit one time per <br /> week. <br /> Metal Containers <br /> Aluminum cans <br /> Ferrous cans <br /> Clear glass <br /> Colored glass <br /> Box Board <br /> Newsprint/magazines <br /> Mail <br /> Direct mail advertisements <br /> Old corrugated containers <br /> Plastic containers#s 1-7(no Styrofoam) <br /> For Residential Units this service will be on the same day as the regularly scheduled solid waste <br /> collection. With the Director's approval, the Contractor will have the right to add or delete material <br /> types from time to time based upon the commercial markets for the materials. Customers will not be <br /> required to separate materials by type prior to collection. All Recyclable Materials collected by the <br /> Contractor will become its property. Such Recyclable Material will not be comingled with Municipal <br /> Solid Waste by the Contractor. Notwithstanding, the Contractor will not discard any portion of the <br /> collected single stream recyclables unless they make up a De Minimis amount included within the non- <br /> recyclable residual remaining after being sorted through a recyclables sorting system. Unauthorized <br /> disposal of Recyclable Materials,which were collected as Recyclable Materials, is strictly prohibited. <br /> B. The Contractor will furnish each Residential Unit with a 96 gallon cart for recycling materials. <br /> These carts will be serviced on an every-other-week basis. <br /> C. The Contractor will not limit, except as may otherwise be noted in this Contract, the amount of <br /> Recyclable Materials residents place for removal. Recyclable materials placed outside the cart must be <br /> in a paper or cardboard container. There is no extra charge for materials in excess of the cart's capacity. <br /> D. The Contractor will notify the City of all instances where the Contractor declines to collect <br /> Recyclable Materials and the reason for it. The Director will investigate all instances of"no pickups," <br /> whether reported by the Contractor or by customers,and advise the customer of the reasons,or require <br /> the Contractor to collect the material. The Director will act in reasonable manner in deciding these <br /> issues,and the Director's decision will be final. <br /> E. The Contractor will discontinue Recyclable Materials collection services to any location as set forth <br /> in a written notice sent to the Contractor by the City. The Contractor will resume collection service at <br /> the location on the next regularly scheduled collection day upon written notice from the City. <br /> F. The Contractor will have all recyclable materials collected by it processed at a recyclable materials <br /> separation/processing site. The Contractor will ensure that any such site used by it is properly licensed <br /> or permitted by the State of Texas and other governmental entities having jurisdiction. The Contractor <br /> may dispose of any contaminated recyclable materials collected. <br /> 6 <br />