My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2009-029
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2009
>
Res 2009-029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2009 3:42:52 PM
Creation date
3/11/2009 2:15:11 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2009-29
Date
3/3/2009
Volume Book
180
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
selected or specially provided for by the Engineer, except that used materials and equipment will <br />be included as if purchased new for the Project. <br />3.1.3 Construction cost does not include the compensation of the Engineer and the Engineer's <br />consultants, or other costs which are the responsibility of the City as provided in Article 2. <br />3.2 RESPONSIBILITY FOR CONSTRUCTION COST <br />3.2.1 Evaluations of the City's Project budget and detailed cost estimates, if any, prepared by <br />the Engineer, will represent the Engineer's best judgment as a design professional familiar with <br />the construction industry. <br />3.2.2 A fixed limit of construction cost for this Project will be established by the City's <br />representative after consulting with the Engineer. The Engineer will be permitted to include <br />contingencies for design, bidding and price escalation, to determine what materials, equipment, <br />and types of construction are to be included in the construction contract documents, to make <br />reasonable adjustments in the scope of the Project and to include in the construction contract <br />documents alternate bids to adjust the construction cost to the fixed limit. The fixed limit of <br />construction cost may be increased by the City. <br />3.2.3 If the lowest bona fide bid exceeds the Engineer's most recent approved cost estimate <br />established as a condition of this Agreement, the City will (1) give written approval of an <br />increase in such fixed limit, (2) authorize re-bidding of the Project within a reasonable time, or <br />(3) cooperate in revising the Project scope and quality to reduce the construction cost. During <br />the development of the Project through the phases described by Article 1 of this Agreement and <br />prior to the City's final approval of construction contract documents, the Engineer will monitor <br />the established probable construction cost in relation to the established fixed limit. <br />If necessary, the Engineer will implement construction cost savings measures or <br />otherwise endeavor to limit probable construction cost to the level of available funds set by the <br />city. <br />ARTICLE 4 <br />REIMBURSABLE EXPENSES <br />4.1 Reimbursable expenses, including such things as expenses for plotting, reproduction of <br />documents except bid documents, auto travel mileage, delivery charges, long distance <br />communications, freight, and state accessibility review are not included in the Engineer's basic <br />services compensation. Reimbursable expenses are to be charged to the City by the Engineer at <br />cost +10%. Reimbursable expenses will not exceed $5,000.00 without the City's prior written <br />approval. <br />11
The URL can be used to link to this page
Your browser does not support the video tag.