My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2009-029
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2009
>
Res 2009-029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2009 3:42:52 PM
Creation date
3/11/2009 2:15:11 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2009-29
Date
3/3/2009
Volume Book
180
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a) Preliminary Report; <br />b) Technical Memorandum; <br />c) Preliminary design plan view sheets at 60% and 90%; <br />d) Preliminary design standard details at 60% and 90%; and <br />e) Preliminary design specifications at 90%. <br />1.3 TASK 3 - FINAL DESIGN <br />This task includes the preparation of plans, specifications for insertion into bid-ready <br />contract documents and a final construction cost estimate. For each Project as assigned by the <br />City, the Engineer will: <br />1.3.1 Provide design plan view sheets, design standard details and design specifications at <br />100%. <br />1.3.2 Assist the City in the preparation of construction contract documents using City forms <br />based on the approved design development documents and any further adjustments authorized by <br />the City in the scope, quality or budget of the Project. The Engineer will use its best professional <br />judgment to create technical documents that comply with applicable construction and <br />development codes, local regulations and ordinances and other federal and state regulations <br />which are known or which should reasonably be known to the Engineer. <br />1.3.3 Head the Project team and coordinate the integration of design, surveying, right of way <br />issues, traffic control, utility Engineering, permitting and other services as previously approved. <br />1.3.4 Conduct meetings with the City and other interested parties periodically or as needed to <br />review and update the City on the progress on the Project. During final design, progress <br />meetings will be held monthly. The Engineer will prepare meeting agendas for each meeting <br />and distribute meeting minutes within five calendar days of each meeting. <br />1.3.5 Be responsible for the printing and binding of 10 sets of bid documents (not including <br />construction drawings) at no additional cost to the City. A total of three sets of construction <br />drawings will be provided; one set will be full-size drawings and two sets will be half-size <br />drawings. The Engineer will provide digital copies of the construction drawings in PDF and <br />CAD. <br />1.3.6 Ensure that no reports, maps, or other documents produced in whole or in part under this <br />Agreement will be the subject of an application for copyright by or on behalf of the Engineer. <br />1.3.7 Obtain approval from City Inspectors of all technical plans and specifications necessary <br />for successful completion of the Project prior to allowing the construction contract to be let for <br />bid. <br />1.3.8 Provide the following deliverables for this Task: <br />5 <br />eo
The URL can be used to link to this page
Your browser does not support the video tag.