My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2009-030
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2009
>
Res 2009-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2009 3:42:45 PM
Creation date
3/11/2009 2:38:53 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2009-30
Date
3/3/2009
Volume Book
180
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Registered Professional Land Surveyor III $ 144.50 per hour <br />Registered Professional Land Surveyor II $ 129.50 per hour <br />Registered Professional Land Surveyor 1... $ 119.50 per hour <br />Survey/Technical Coordinator $ 114.50 per hour <br />Senior Survey Technician $ 109.50 per hour <br />Survey Technician III $ 102.50 per hour <br />Survey Technician II $ 97.50 per hour <br />Survey Technician I $ 92.50 per hour <br />Administrative Assistant III $ 77.50 per hour <br />Administrative Assistant II $ 74.50 per hour <br />Administrative Assistant I. $ 70.50 per hour <br />Secretary III $ 65.50 per hour <br />Secretary II $ 60.50 per hour <br />Secretary I $ 57.50 per hour <br />Construction Observer $ 102.50 per hour <br />Expert Witness $ 325.00 per hour <br />FIELD PARTY SERVICES <br />2-Man Field Party $ 142.50 per hour <br />3-Man Field Party $ 167.50 per hour <br />4-Man Field Party $ 192.50 per hour <br />NOTES: <br />Field Party rates include a charge for normal equipment, normal supplies and survey <br />vehicles. Abnormal use of stakes, lathes, etc. used (such as during the construction phase of a <br />project) will be charged as indicated. A mileage charge will be billed for projects exceeding a <br />50 mile radius of the base office. <br />2. A minimum of two (2) hours Field Party time charge will be made for show up time and <br />return to office, resulting from inclement weather conditions, etc. <br />3. Field Party stand-by time will be charged for at the appropriate rates shown above. <br />These hourly rates will remain in effect until January 1, 2010. Thereafter hourly rates may be <br />adjusted each January 1St for the term of the Agreement based on negotiations between the <br />Engineer and the City, and no such adjustment will exceed an annual increase of 4%. Hourly <br />rates for the Engineer's subconsultants will be included at the time the City engages the Engineer <br />under a specific Work Authorization. <br />19
The URL can be used to link to this page
Your browser does not support the video tag.