My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-114/Professional Services Agreement between the City and CH2M Hill Engineers, Inc. for the provision of Professional Engineering Services in connection with the miscellaneous improvements at the San Marcos Wastewater Treatment Plant Project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-114/Professional Services Agreement between the City and CH2M Hill Engineers, Inc. for the provision of Professional Engineering Services in connection with the miscellaneous improvements at the San Marcos Wastewater Treatment Plant Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2015 9:22:15 AM
Creation date
9/10/2015 2:37:43 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-114
Date
9/1/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10) The Engineer's master specifications will be used as the basis for the development of all <br />Division 1 and technical specifications. <br />11) The drawings will follow the City's CAE /CAD standards. Microstation will be used to <br />develop the drawings. <br />12) The City's standard construction notes will be utilized in developing the construction <br />drawings. <br />13) Any investigation and remediation of possible hazardous materials encountered is not <br />included in this Agreement and will be considered an additional service. <br />14) Restoration will be seeding and sod and no special landscape design effort is required. <br />15) Project Schedule - It is anticipated that the contract period for design will occur in 2015. It <br />is assumed all design work will be completed in 2 months from the effective date of the <br />Agreement. A detailed project schedule will be developed and submitted to the City for <br />acceptance prior to the beginning of Design activities. <br />A. Basic Services: <br />The total of all fees and expenses to be paid to the Engineer for the Engineer's satisfactory <br />performance of Basic Services as described in Section A is a total fixed fee $137,179.00 which <br />includes labor and expenses. The amounts of these invoices will be based upon the extent of work <br />completed on a percentage basis. This compensation is divided among the Basic Services and <br />Reimbursable Expenses as follows: <br />TABLE 1 <br />2015 Miscellaneous Improvements at the San Marcos WWTP Engineering Design Fee Summary Breakdown <br />Description of Services Labor Hours Fee <br />Project Management — Design Phase $14,100 <br />Non - Potable System Upgrade <br />$46,179 <br />Centrifuge Replacement <br />$57,400 <br />Sludge Holding Tank Repairs <br />$7,500 <br />Secondary Clarifiers 1 &2 Concrete Crack Repairs <br />$9,000 <br />Design Review Workshop <br />$3,000 <br />Total <br />1,081 $137,179 <br />CITY HALL ® 630 EAST HOPKINS ® SAN MARCOS, TEXAS 78666 e 512.393.8150 a FACSIMILE 855.759 -2846 <br />SANMARCOSTX.GOV <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.