Laserfiche WebLink
the Engineer's role and responsibility will govern and control. <br />ARTICLE 14 <br />NOTICES <br />14.1 Notices required under this Agreement will be provided by the parties to one another by <br />certified mail, return receipt requested, or by confirmed facsimile transmission, to the following <br />addresses: <br />To the City: To the En ig neer: <br />City Manager Gary M. Lacy, P.E., President <br />City of San Marcos Recreation Engineering & Planning <br />630 E. Hopkins 485 Arapahoe Ave. <br />San Marcos, Texas 78666 Boulder, Colorado 80302 <br />Fax: 512.396.4656 Fax: 303.545.5803 <br />ARTICLE 15 <br />BASIS OF COMPENSATION <br />15.1 The City will compensate the Engineer, in accordance with Article 5, Payments to the <br />Engineer, and the other terms and conditions of this Agreement, as follows: <br />15.2 The total of all fees and expenses to be paid to the Engineer for Basic Services as described <br />in Sections 1.1 through 1.7 is a not to exceed fee of $197,525.00. This compensation is divided <br />among the Basic Services. <br />1.1 -TASK 1— PROJECT MANAGEMENT AND MEETINGS $19,650.00 <br />1.2 -TASK 2 - PRELIMINARY DESIGN AND DEVELOPMENT $36,000.00 <br />1.3 -TASK 3 - CONSTRUCTION PLANS AND SPECIFICATIONS $56,100.00 <br />1.4 -TASK 4 — DETAILED COST ESTIMATE $ 3,625.00 <br />1.5 -TASK 5 - REQUEST FOR PROPOSAL ASSISTANCE $ 7,250.00 <br />1.6 -TASK 6 - CONSTRUCTION ADMINISTRATION $56,900.00 <br />REIMBURSABLE EXPENSES $18,000.00 <br />TOTAL FEE: $197,525.00 <br />15.3 Compensation for the Engineer's additional services will be computed based on the <br />following: <br />Fee Schedule <br />2012 REP Rate Schedule <br />Principal Engineer <br />REP Agreement for Cross -Town Pathway Project 9/1/2015 <br />19 <br />$160.00 / Hour <br />