My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-113/approving a professional engineering services agreement between the City and Recreation Engineering & Planning, Inc., for the provision of professional services in connection with the Cross-Town Pathway Trails Project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-113/approving a professional engineering services agreement between the City and Recreation Engineering & Planning, Inc., for the provision of professional services in connection with the Cross-Town Pathway Trails Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2015 3:35:19 PM
Creation date
9/10/2015 4:50:21 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-113
Date
9/1/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CSJ # 0914 -33 -069 Fed.# STP 014(131 }'1'E <br />District # AUS - 14 <br />Code Chart 64 # 02100 <br />Project: Cross -Town Pathway <br />Federal Highway Administration <br />CFDA # 20.205 <br />Not Research and Development <br />Project for its intended purpose, the Local Government shall return the federal funds in <br />accordance with CFR federal recapture requirements. Should the Local Government <br />consider conveying the property, the State and FHWA must be notified prior to the sale, <br />transfer, or disposal of any property that received federal funds. Written concurrence of <br />approval for the transaction detailing any required recapture must be obtained from FHWA <br />prior to the transaction. Advance notice from the Local Government of their intended <br />action must be submitted to the State for an FHWA review a minimum of sixty (60) days <br />prior to any action being taken by the Local Government. The Local Government shall be <br />held responsible for reimbursement of all federal funds used or a portion of those funds <br />based on a pro -rata amount, considering the original percentage of federal funds provided <br />and the time elapsed from the Project completion date. This same percentage of <br />reimbursement also applies to any amount of profit that may be derived from the <br />conveyance of the property, as applicable. <br />B. Any manufacturer warranties extended to the Local Government as a result of the Project <br />shall remain in the name of the Local Government. The State shall not be responsible for <br />honoring any warranties under this LPAFA. <br />C. Should the Local Government derive any income from the development and operation of <br />the Project, a portion of the proceeds sufficient for the maintenance and upkeep of the <br />property, shall be set aside for future maintenance. A project income report shall be <br />submitted to the State on a quarterly basis. Monies set aside according to this provision <br />shall be expended using accounting procedures established under OMB -133 and with the <br />property management standards established in Title 49 CFR §18.32. <br />D. Should any historic properties be included in or affected by this federally funded Project, <br />the historic integrity of the property and any contributing features must continue to be <br />preserved regardless of any approved changes that may occur throughout the life of the <br />Project. <br />11. Local Project Sources and Uses of Funds <br />A. A Project Budget Estimate is provided in Attachment C, showing the total estimated <br />development cost of the Project. This estimate shows the itemized cost of real property, <br />utilities, environmental assessments and remediation, construction, and any other <br />substantial items of cost. To be eligible for reimbursement, costs must have been <br />included in the itemized budget section of the nomination form approved by the Texas <br />Transportation Commission. The State and the Federal Government will not reimburse <br />the Local Government for any work performed before federal spending authority is <br />formally obligated to the Project by the Federal Highway Administration. After federal <br />funds have been obligated, the State will send to the Local Government a copy of the <br />formal documentation showing the obligation of funds including federal award information. <br />The Local Government is responsible for 100% of the cost of any work performed under <br />its direction or control before the federal spending authority is formally obligated. <br />B. If the Local Government will perform any work under this LPAFA for which reimbursement <br />will be provided by or through the State, the Local Government must complete training in <br />Local Government Procedures Qualification for the Texas Department of Transportation <br />before federal spending authority is obligated. Training is complete when at least one <br />AFA —LPAFA TE Page 7 of 13 Rev. 01/17/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.