Laserfiche WebLink
Good Utility Practice, applicable ERCOT operating and metering guidelines, and the ERCOT <br />Protocols. <br />9.3 The City's requirement (if any) to supply real-time telemetry data to ERCOT, as <br />described in the ERCOT Protocols and referred to in the NERC Reliability Standards, is <br />accomplished through the LCRA TSC as it performs the functions of the City's ERCOT <br />Transmission Operator. <br />ARTICLE X - INDEMNIFICATION <br />10.1 EACH PARTY SHALL INDEMNIFY, DEFEND, AND SAVE HARMLESS THE <br />OTHER PARTY, ITS DIRECTORS, OFFICERS, AND AGENTS (INCLUDING, BUT NOT <br />LIMITED TO, DIRECTORS, OFFICERS, AND EMPLOYEES OF ITS AFFILIATES AND <br />CONTRACTORS) FROM ANY AND ALL DAMAGES, LOSSES, CLAIMS, INCLUDING <br />CLAIMS AND ACTIONS RELATING TO INJURY TO OR DEATH OF ANY PERSON OR <br />DAMAGE TO PROPERTY, DEMANDS, SUITS, RECOVERIES, COSTS AND EXPENSES, <br />COURT COSTS, ATTORNEY FEES, AND ALL OTHER OBLIGATIONS BY OR TO THIRD <br />PARTIES, ARISING OUT OF OR RESULTING FROM GROSS NEGLIGENCE OR OTHER <br />FAULT IN THE DESIGN, CONSTRUCTION, OR OPERATION OF THEIR RESPECTIVE <br />FACILITIES DURING THE PERFORMANCE OF THIS AGREEMENT AND TO THE EXTENT <br />PERMITTED BY LAW, EXCEPT IN CASES OF GROSS NEGLIGENCE OR INTENTIONAL <br />WRONGDOING BY THE OTHER PARTY. <br />ARTICLE XI -NOTICES <br />11.1 Notices of an administrative nature, including but not limited to a notice of <br />termination, a request for amendment, a change to a Point of Interconnection, or a request for a new <br />Point of Interconnection, shall be forwarded to the designees listed below for each Parry and shall be <br />deemed properly given if delivered in writing to the following: <br />(a) San Marcos Electric Utility <br />Electric Utility Director <br />630 East Hopkins <br />San Marcos, TX. 78666-6397 <br />(b) LCRA TRANSMISSION SERVICES CORPORATION <br />Manager, Transmission Engineering <br />LCRA <br />P.O. Box 220 <br />Austin, TX 78767-0220 <br />LCRA TSC - San Marcos Electric Utility Page 9 of 35