My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2009-039
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2009
>
Res 2009-039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2009 2:05:07 PM
Creation date
4/8/2009 9:31:06 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2009-39
Date
3/31/2009
Volume Book
180
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FACILITY SCHEDULE NO. 3 <br />1. Name: McCarty Lane Substation <br />2. Facility Location: The McCarty Lane Substation is located at 1502 E. McCarty Lane, San <br />Marcos, Hays County, Texas. <br />3. Points of Interconnection: There are six (6) points of interconnection at McCarty Lane <br />Substation generally described as: <br />• where the incoming distribution line connects to the tubular bus between switches <br />ML-31 and ML-33 at breaker ML-30. <br />• where the jumper from breaker ML-30, passing through CT-5, connects to the 4 hole <br />pad on switch ML-29. <br />• where the jumper from breaker ML-30 connects to the 4 hole pad on switch ML-31. <br />• where the incoming distribution line connects to the tubular bus between switches <br />ML-41 and ML-43 at breaker ML-40. <br />• where the jumper from breaker ML-40, passing through CT-6 connects to the 4 hole <br />pad on switch ML-39. <br />• where the jumper from breaker ML-40 connects to the 4 hole pad on switch ML-41. <br />4. Transformation Services Provided by LCRA TSC: Yes <br />5. Metering Services Provided by LCRA TSC: Yes <br />6. Delivery Voltage: 12.5 kV <br />7. Metered Voltage and Location: The metered voltage is 12.5 W. The metering current <br />transformers are located in the distribution bays ML-30 and ML-40. The metering <br />potential transformers are located on the 12.5 kV operating bus. <br />8. One Line Diagram Attached: Yes <br />9. Description of Facilities Owned by Each Party: <br />San Marcos Electric Utilities owns: <br />• Two (2) distribution circuit breakers ML-30 and ML-40, and associated foundations, <br />jumpers, relaying, control panels, and cabling <br />• Six (6) riser pole distribution surge arresters at the feeder exits <br />• Two (2) steel distribution structures for underground feeder exits <br />LCRA TSC - San Marcos Electric Utility Page 21 of 35
The URL can be used to link to this page
Your browser does not support the video tag.