My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2003-114
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2003
>
Res 2003-114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2009 9:50:35 AM
Creation date
4/20/2009 9:49:03 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2003-114
Date
7/14/2003
Volume Book
152
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Electric System Analysis Agreement (page 4 of 4) <br />Pricing for <br />Electric System Analysis Services Program Agreement <br />For Distribution Systems up to 3200 poles or underground device (primary and secondary): <br />Study Price = $4,850 + 5 x (# poles/UG in system) <br />For Distribution Systems over 3200 poles or underground device (primary and secondary): <br />Study Price = $16,500 + 0.15 x (12-month system NCP`, 60-minute interval in kW) <br />Monthly Charges = {[(Study Price / 5) + Continual Update Price'}] x CPI Inflation Factor-J/ 12 <br />Total Charges will normally be billed in monthly installments as a line item on customer's power bill. Other <br />arrangements can be made at customer's request. <br />Monthly fee will be updated each July 1 and will be constant for one year. <br />The updated price will reflect changes in the pole count, system NCP, and CPI. <br />Notes: <br />'NCP is the ratcheted Non Coincidental Peak which appears on the customer's power bill. <br />This is the highest system demand (60-minute basis) during the past 12 months. <br />-Calculation of Continual Update Price: <br />PoleslUG in System Annual Fee <br />0 - 1500 poles/UG $600 <br />1501 - 2500 poles/UG $900 <br />2501 - 3200 poles/UG $1,200 <br />3201 or more poles/UG $1,500 <br />-Calculation of CPI Inflation Factor: <br />Contract price will be adjusted to reflect changes in the CPI (Consumer Price Index) from June 1996 to <br />June of 2002. Increase from June 1996 to June 1999 is (179.9 / 156.7) = 14.8% <br />Sample Calculation for City of San Marcos: <br />Number of Primary Distribution poles/UG: 9,700 <br />Study Price = = $16,500 + 0.15 x (12-month system NCP`, 60-minute interval in kW) <br />Continual Update Price = $1,500 per year (based on 9,700 poles) <br />Monthly Charges = {[($\$16,500 + 0.15 x (12-month system NCP', 60-minute interval in kW)) / 5] + <br />$1,500]} * (179.9 / 156.7) / 12 = $727.65 <br />L O W E R C O L O R A D O R I V E R A U T H O R I T Y
The URL can be used to link to this page
Your browser does not support the video tag.