Laserfiche WebLink
Construction Services Manager <br />$ <br />110.00 <br />Hr <br />Senior Technician <br />$ <br />65.00 <br />Hr <br />Technician time <br />$ <br />50.00 <br />Hr <br />Clerical <br />$ <br />50.00 <br />Hr <br />Other <br />Vehicle Charge <br />$ <br />65.00 <br />Per Trip <br />Observation Time (Masonry, Foundation, Reinforcing <br />Steel, and Asphalt Testing) <br />$ <br />48.00 <br />Hr <br />Observation Time, Overtime (Masonry, Foundation, <br />Reinforcing Steel, and Asphalt Testing) <br />$ <br />68.00 <br />Hr <br />Outside Professional Services & Reimbursable <br />Cost plus 5% <br />Additional Insured <br />Cost +15% <br />Project Coordination <br />$ <br />65.00 <br />Hr <br />Project Completion Letter <br />$ <br />275.00 <br />Total <br />Report Preparation /Report Distribution <br />10% total costs <br />CITY HALL ® 630 EAST HOPKINS 0 SAN MARCOS, TEXAS 78666 e 512.393.8150 ® FACSIMILE 855.759.2846 <br />SANMARCOSTX.GOV <br />4 <br />