Laserfiche WebLink
Swimming Pools <br />$100.00 <br />$101.50 <br />Temporary Structures/Tents - Up to <br />1,000 Square Feet <br />$25.00 <br />$25.50 <br />Temporary Structures/Tents - Over <br />1,000 Square Feet <br />$50.00 <br />$50.75 <br />Mobile Homes <br />$35.00 <br />$35.50 <br />Mobile Homes - Electrical, Plumbing, <br />and Mechanical in a Mobile Home <br />Park <br />$15.00 each <br />$15.25 each <br />Moving Permits <br />$50.00 <br />$50.75 <br />Temporary Food Service <br />$50.00 <br />$50.75 <br />Foundation Permit <br />$.05 cents per square foot ($25 min) <br />$.10 cents per square foot ($25.25 <br />min) <br />Re- inspection Fee (2nd and <br />Subsequent Inspections) <br />$40.00 per inspection <br />$40.75 per inspection <br />Replacement Permit for Lost or <br />Damaged Permit <br />$25.00 <br />$25.50 <br />Work begun without a Permit <br />Double the Normal Fee ($200 min) <br />Double the Normal Fee ($203 min) <br />Homeowner's Statement <br />N/A <br />N/A <br />Application Deposit- Paid Up Front <br />and Applied to Balance (Non- <br />Refundable) <br />50% of permit fee - not to exceed <br />$2001 <br />50% of permit fee - not to exceed <br />$2031 <br />After Hours Inspection Fee <br />$75.00 / hr. (2 hr. min) <br />$76.25 / hr. (2 hr. min) <br />My Permit Now Technology Fee (To <br />Be Applied to all Permits) <br />$10.00 <br />$10.25 <br />Sidewalk Fee in Lieu <br />$5.00 per square foot <br />$5.25 per square foot <br />Resubmittal Fee for 3'd Submittal (All <br />Permit Types) <br />$250.00 each resubmittal <br />$253.75 each resubmittal <br />SITE FEES <br />Previous Fee (Adopted August 7, <br />2012) <br />Adopted October 1, 2015 <br />Watershed Protection: <br />Watershed Protection Plan Phase 1 <br />$450.00 <br />$456.75 <br />Watershed Protection Plan Phase 11 <br />$600.00 + $50.00 / acre ($3000 max) <br />$609.00 + $50.75 / acre ($3045 max) <br />Public Improvement Construction <br />Plans (PICP) <br />Subdivision Improvements Including <br />More than 1 Type of Infrastructure <br />$2000.00 + $50.00 / acre (includes the <br />entire limits of construction) <br />$2030.00 + $50.75 / acre (includes the <br />entire limits of construction) <br />Individual Transportation or Utility <br />Infrastructure Extensions <br />$1000.00 + $5.00 / linear ft. of each <br />improvement <br />$1015.00 + $5.25 / linear ft. of each <br />improvement <br />Site Preparation <br />Complete Site Preparation (Requires <br />Engineer) <br />$1500.00 + $50.00 / acre <br />$1522.50 + $50.75 / acre <br />Small Site Preparation <br />$250.00 <br />$253.75 <br />San Marcos River Corridor Site Plan <br />$250.00 <br />$253.75 <br />Permit to Install On -Site Sewage <br />Disposal System <br />$175.00 <br />$177.75 <br />TIA <br />$315.00 <br />$319.75 <br />TIA (Worksheet) <br />$100.00 <br />$101.50 <br />Driveway / Sidewalk Permit <br />