Laserfiche WebLink
If yes, are traffic signals warranted? ® yes ? no <br />At which intersections are signals proposed? Access roads at UPRR at-grade crossing. <br />B. Is safety lighting proposed? ? yes ® no <br />If yes, where? Possibly access road under bridge structure - TBD. <br />C. Is continuous lighting proposed? ® yes ? no <br />If yes, where? Loop 82 <br />D. Are Intelligent Transportation System (ITS) items proposed? ? yes ® no <br />Proposed Miscellaneous Elements <br />A. Geotechnical exploration <br />Is geotechnical exploration needed for any of the following (mark all that apply)? <br />® Roadway ® Bridge N Retaining/Noise wall ? Storm Drain ? Other <br />B. Will all requirements of the Americans with Disabilities Act Accessibility Guidelines <br />(ADAAG), Texas Accessibility Standards (TAS) and related rules be met? <br />® yes ? no <br />C. Are railroad agreements needed? ® yes If yes, 1) Access road at-grade <br />? no where? crossing. <br />2) Bridge overpass crossing. <br />Attachments to be provided by the applicant: <br />Project location map (drawn to scale) showing proposed alignments and approximate <br />locations for the following items: <br />a. Roadway layout <br />b. Potential environmental issues (e.g. natural habitat, wetlands, cemeteries, historic <br />features, contaminated sites) <br />c. Railroad crossings <br />2. Existing and Proposed Typical Sections for roadways and bridges including the following <br />items at a minimum: <br />a. Lane, shoulder, median and speed change lane widths <br />b. Cross slopes, side slopes, horizontal clearance and ROW limits <br />c. Provisions for pedestrians, bicyclists and parking ( if applicable) <br />d. Pavement layer thickness and composition (e.g. subbase, base, surface course) <br />3. Typical sections for major phases of construction traffic control. <br />4. Detailed cost estimate or basis for the cost estimate provided <br />5. If project is proposed as a toll facility, provide the following: <br />a. Description and/or layout of the segments to be tolled, and those that will not be tolled,