Laserfiche WebLink
ATTACHMENT B <br />NOT -TO- EXCEED T&M FEE SCHEDULE <br />CITY OF SAN MARCOS <br />MCKIE AND LEE STREET WATER REPLACEMENT <br />10 SEPTEMBER 2015 <br />Task <br />Description <br />Project <br />Manager/ <br />Engineer <br />185 <br />Weston Solutions, Inc. <br />Graduate <br />Engineer Engineer Senior CAD <br />III IV / GIS <br />J 130 a100 $112 <br />Admin. <br />$73 <br />WESTON <br />Subtotals <br />Hrs Amt <br />Topo Survey <br />Byrn & <br />Associates <br />(Attachment B3) <br />Geotechnical <br />Investigation <br />Holt <br />Engineering <br />(Attachment B2) <br />Total <br />1000 <br />'PRELIMINARY PHASE (30%) <br />Project Meetings (1 Meeting) <br />2 <br />2 <br />4 <br />$570 <br />$570 <br />Data Collection and Review <br />4 <br />2 <br />6 <br />$546 <br />$546 <br />Site Visits <br />4 <br />4 <br />$400 <br />$400 <br />Staff Meetings <br />2 <br />2 <br />2 <br />2 <br />8 <br />$1,054 <br />$1,054 <br />Topographic Survey <br />2 <br />4 <br />6 <br />$818 <br />$15,000 <br />$15,818 <br />Subsurface Utility Locate <br />(Included in <br />Supplemental Services) <br />Geotechnical Investigation <br />(Included in <br />Supplemental Services) <br />Environmental & Permitting Review <br />2 <br />2 <br />12 <br />8 <br />24 <br />$2,726 <br />$2,726 <br />Archeological (THC Coordination Letter) <br />4 <br />4 <br />$400 <br />$400 <br />Determine Alignment <br />1 <br />8 <br />8 <br />17 <br />$1,881 <br />$1,881 <br />Identify Utility Providers <br />1 <br />8 <br />1 <br />30 <br />$1,058 <br />$1,058 <br />Preliminary Opinion of Probable Construction Cost <br />1 <br />2 <br />8 <br />1 <br />12 <br />$1,318 <br />$1,318 <br />Deliverable- Brief Tech Memo (3 Hard Copies, 1 PDF) <br />1 <br />2 <br />8 <br />6 <br />17 <br />$1,683 <br />$1,683 <br />,Subtotals <br />12 <br />8 <br />60 <br />22 <br />10 <br />112 <br />$12,454 <br />$15,000 <br />$0 <br />$27,454 <br />Subcontractor Markup (10%) <br />$11500 <br />$0 <br />$1,500 <br />Allowance for Reimburseables (S %) <br />$623 <br />$623 <br />PRELIMINARY PHASE 30% TOTAL <br />13 077 <br />16 500 <br />0 <br />29 577 <br />2000 <br />DESIGN PHASE (60/90/100%) <br />Project Meetings (2 Plan Rev. Meetings, @60% & <br />4 <br />4 <br />8 <br />$1,140 <br />$1,140 <br />@90%) <br />Public Meeting & Exhibits (1 Meeting) <br />2 <br />4 <br />6 <br />$818 <br />$818 <br />Design Phase Site Visits <br />4 <br />4 <br />$400 <br />$400 <br />Permitting Submittals <br />2 <br />8 <br />2 <br />12 <br />$1,206 <br />$1,206 <br />SWPPP <br />1 <br />1 <br />8 <br />12 <br />22 <br />$2,459 <br />$2,459 <br />60% Plans (4. 11 "'x17 " Sets + 1 PDF) (Cover Sheet, <br />2' <br />2 <br />12 <br />40 <br />4 <br />60 <br />$6,602 <br />$6,602 <br />Project Layout Sheet, Traffic Control Sheets, Tree & <br />Erosion Sedimentation Control Sheets, List of Standard <br />Details, and Special Details) <br />60% List of Specifications <br />1 <br />2 <br />12 <br />15 <br />$1,645 <br />$1,645 <br />60% Opinion of Probable Construction Cost (OPCC) <br />1 <br />2 <br />4 <br />7 <br />$845 <br />$845 <br />60% Construction Schedule <br />1 <br />2 <br />3 <br />$385 <br />$385 <br />90% Plans (4 - 11 "x17" Sets + 1 PDF) (Cover Sheet, <br />4 <br />1 <br />8 <br />24 <br />4 <br />41 <br />$4,650 <br />$4,650 <br />Project Layout Sheet, Plan & Profile Sheets, Quantities <br />By Sheet, Traffic Control Sheets, Tree & Erosion <br />Sedimentation Control Sheets, Standard Details, and <br />Special Details) <br />90% Specifications <br />1 <br />4 <br />8 <br />4 <br />17 <br />$1,797 <br />$1,797 <br />90% Opinion of Probable Construction Cost (OPCC) <br />1 <br />2 <br />2 <br />5 <br />$645 <br />$645 <br />90% Construction Schedule <br />1 <br />2 <br />3 <br />$385 <br />$385 <br />90% Bid Form <br />1 <br />2 <br />2 <br />5 <br />$531 <br />$531 <br />99% Submittal (Unsealed Plans -4.11 "x17 " Sets +1 <br />1 <br />2 <br />4 <br />12 <br />1 <br />20 <br />$2,262 <br />$2,262 <br />PD <br />100% Final Submittal ('Sealed Plans. 2 - 11 "x17" Sets + 1I <br />2 <br />2 <br />16 <br />4 <br />1 <br />25 <br />$2,751 <br />$2,751 <br />PDF +1 CAD; Construction Checklist; Bid Form in <br />MSWord; and Specifications in PDF) <br />Subtotals <br />23 <br />20 <br />96 <br />96 <br />18 <br />253 <br />$28,521 <br />$0 <br />$0 <br />$28,521 <br />Subcontractor Markup (10%) <br />$0 <br />$0 <br />$0 <br />Allowance for Reimburseables (5 %) <br />$1,426 <br />$1,426 <br />'DESIGN <br />PHASE 90 300% TOTAL <br />29 947 <br />0 <br />0 <br />29 947 <br />HM <br />