My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-150/City and Weston Solutions, Inc., for the provision of professional services in connection with the McKie and Lee Street Water Replacement Project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-150/City and Weston Solutions, Inc., for the provision of professional services in connection with the McKie and Lee Street Water Replacement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2015 1:50:47 PM
Creation date
12/1/2015 2:58:56 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-150
Date
11/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3of3 <br />ATTACHMENT B <br />Z <br />NOT -TO- EXCEED T &M FEE SCHEDULE <br />CRY OF SAN MARCOS <br />MCKIE AND LEE STREET WATER REPLACEMENT <br />10 SEPTEMBER 2015 <br />Weston Solutions, Inc. <br />Geotechnical <br />TopoSurvey <br />Investigation <br />Project Graduate <br />Byrn & <br />Holt <br />Manager/ Engineer Engineer Senior CAD <br />WESTON <br />Associates <br />Engineering <br />Task <br />Description Engineer III IV / GIS Admin. <br />Subtotals <br />(Attachment 133) <br />(Attachment 82) <br />Total <br />$185 $130 $100 $112 $73 <br />Hrs Amt <br />6000 <br />SUPPLEMENTAL SERVICES <br />Geotechnical Investigation (4 Bores @35' Ea.) 2 2 <br />4 $424 <br />$7,290 <br />$7,714 <br />Subsurface Utility Locate Allowance, As- required <br />$8,000 <br />Subtotals 2 2 <br />4 $424 <br />$0 <br />$7,290 <br />$15,714 <br />Subcontractor Markup (10%) <br />$0 <br />$729 <br />$729 <br />Allowance for Reimburseables (5 %) <br />$21 <br />$21 <br />SUPPLEMENTAL SERVICES TOTAL $445 $0 $8,019 <br />$16464 <br />TOTAL - BASIC AND SUPPLEMENTAL SERVICES <br />$97,631 <br />The hours listed above are an estimate. The hours assigned to the Phase are not exclusive to the Phase which they are assigned. The total fee will not exceed the total contract amount as <br />discussed in <br />Article 2. <br />The hourly rates of this contract shall apply to throughout the remainder of this contract and to all change in services, <br />Payment to the ENGINEER will be made as follows: <br />1. Basic Services - The amounts of these invoices will be based upon the extent of work completed by the Engineer on an hourly basis. <br />2, Supplemental Services - The Engineer will receive approval in writing before performing supplemental services. The amounts of these invoices will be based upon the extent of work <br />completed by the Engineer on an hourly basis. <br />3. Reimbursable expense - Reimbursable expenses including such things as expenses for plotting, reproduction of documents„ auto travel mileage Qcurrent IRS approved mileage rate), <br />delivery charges, long distance communications, freight, and state accessibility will be invoiced with appropriate backup documentation. <br />Invoice and Time of Payment <br />Invoices will be prepared in a format approved by the City prior to submission of the first monthly invoice. Invoices shall be submitted monthly and paid within 30 days. <br />3of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.