My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-160/approving a professional engineering services agreement between the City and Unintech Consulting Engineers, inc. for the provision of professional services in connection with the Mill Street Improvements project in the not-to-exceed amount o
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-160/approving a professional engineering services agreement between the City and Unintech Consulting Engineers, inc. for the provision of professional services in connection with the Mill Street Improvements project in the not-to-exceed amount o
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2016 2:12:22 PM
Creation date
12/1/2015 3:08:00 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-160
Date
11/17/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Engineer is solely responsible for any additional premium for the supplemental <br />extended reporting period. <br />B. Endorsements/Waiver of Subrol?ation. The Engineer agrees to provide commercial <br />general liability insurance and motor vehicle insurance written with the City of San Marcos, Texas <br />endorsed as an additional insured. A waiver of the carrier's right of subrogation against the City <br />of San Marcos is required for each insurance policy. <br />C. Deductibles, Coinsurance Penalties. and Self- Insured Retention. Engineer agrees to be <br />fully and solely responsible for any costs or expenses as a result of a coverage deductible, <br />coinsurance penalty, or self - insured retention; including any loss not covered because of the <br />operation of such deductible, coinsurance penalty, or self - insured retention. <br />D. Subcontractor's Insurance. The Engineer will ensure that each subcontractor employed <br />by the Engineer for this Project purchases and maintains insurance of the types specified, provided <br />that the Engineer's insurance does not afford coverage on behalf of the subcontractor. <br />E. Certificate of Insurance Form. The Engineer will furnish the City with a certificate(s) <br />of insurance, executed by a duly authorized representative of each insurer, showing compliance <br />with the insurance requirements. The certificate must be from a company with an A.M. Best rating <br />of "AVII" or better and/or otherwise acceptable to the City. Certificates must be submitted using <br />the ACORD form and all endorsements must be included with the submittal. All certificates will <br />provide that coverage under the policies will not be canceled or non - renewed until at least thirty <br />(30) calendar days prior written notice, or ten (10) calendar days notice of cancellation due to the <br />non - payment of premiums is given to the City. Failure of the Engineer to demand a certificate or <br />other sufficient evidence of full compliance with these insurance requirements or failure of the <br />Engineer to identify a deficiency from the evidence that is provided as proof of insurance will not <br />be construed as a waiver of the Engineer's obligation to maintain the required insurance coverage <br />specified herein. If, in the event the City is notified that a required insurance coverage will cancel <br />or non -renew during the contract period, the Engineer agrees to furnish prior to the expiration of <br />such insurance, a new or revised certificate(s) as proof that equal and like coverage is in effect. <br />The City reserves the right, but not the obligation, to withhold payment to the Engineer until <br />coverage is reinstated. Certificates and notices will be given to the City at the following address: <br />City of San Marcos <br />Attn: Engineering and Capital Improvements Department <br />630 E. Hopkins <br />San Marcos, Texas 78666 <br />F. Right to Review and Adjust. The City reserves the right to review these requirements <br />and to modify insurance coverage and their limits when deemed necessary and prudent. <br />Unintech Consulting Engineers, Inc. — Mill Street Project <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.