My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2011-037 (2)
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2011
>
Res 2011-037 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2024 3:23:36 PM
Creation date
12/21/2015 4:53:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 1. Estimated project timeline — Does not include sampling events that will follow <br />significant rainfall during study period. <br />Month / Year <br />Sample events preconstruction: January 2011 <br />to acquire baseline water quality. March 2011 <br />May 2011 <br />Construction presumed to begin Summer 2011. <br />Sample events during construction. <br />July <br />2011 <br />September <br />2011 <br />November <br />2011 <br />January <br />2012 <br />March <br />2011 <br />May <br />2012 <br />July <br />2012 <br />*Extraction of samples will occur within 7 days of collection for analysis. <br />Table 2. Chemical Parameters, including target cations and anions. <br />Total Alkalinity <br />Total Dissolved Solids <br />Total Hardness <br />Total Coliform Bacteria <br />Cations Barium <br />Calcium <br />Iron <br />Magnesium <br />Manganese <br />Potassium <br />Silicon <br />Sodium <br />Strontium <br />Anions Nitrite-N <br />Nitrate-N <br />Chloride <br />Sulfate <br />Ortho-phosphate-P <br />Fluoride <br />-18- <br />
The URL can be used to link to this page
Your browser does not support the video tag.