Table 1. Estimated project timeline — Does not include sampling events that will follow <br />significant rainfall during study period. <br />Month / Year <br />Sample events preconstruction: January 2011 <br />to acquire baseline water quality. March 2011 <br />May 2011 <br />Construction presumed to begin Summer 2011. <br />Sample events during construction. <br />July <br />2011 <br />September <br />2011 <br />November <br />2011 <br />January <br />2012 <br />March <br />2011 <br />May <br />2012 <br />July <br />2012 <br />*Extraction of samples will occur within 7 days of collection for analysis. <br />Table 2. Chemical Parameters, including target cations and anions. <br />Total Alkalinity <br />Total Dissolved Solids <br />Total Hardness <br />Total Coliform Bacteria <br />Cations Barium <br />Calcium <br />Iron <br />Magnesium <br />Manganese <br />Potassium <br />Silicon <br />Sodium <br />Strontium <br />Anions Nitrite-N <br />Nitrate-N <br />Chloride <br />Sulfate <br />Ortho-phosphate-P <br />Fluoride <br />-18- <br />