My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2009-078
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2009
>
Res 2009-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2015 8:16:33 AM
Creation date
6/5/2009 3:04:50 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
CDBG
Number
2009-78
Date
6/2/2009
Volume Book
181
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Substantial Amendment to the <br />City of San Marcos CDBG 2008 Action Plan <br />Downtown Sidewalk Accessibility Improvements Project <br />CDBG -R Funding <br />Project <br />Activity: Downtown Sidewalk Accessibility Improvements <br />Funding: $133,827 <br />Activity: Program Administration <br />Funding: $6,000 (4% of total) <br />National Objective /Eligibility Data <br />Matrix Code: 03L Public Facility - Sidewalks, 570.201(c) <br />Accomplishment Code: 11 Public Facility <br />National Objective: Benefit low to moderate income persons <br />Low -Mod Area Benefit <br />➢ Service Area: Census Block Group 01010.01 <br />➢ Service Area Total Population: 746 <br />➢ Service Area Low -Mod Population: 509 <br />➢ Service Area Low /Mod Percentage: 68.2% <br />• <br />Project Summary <br />The project will remove architectural barriers in existing sidewalks in the downtown area by the construction of <br />ADA ramps and crosswalks to improve accessibility for individuals with a disability, the elderly, and the general <br />public. The City anticipates installing approximately 20 ramps with these funds. <br />Project scope will include: <br />(a) Professional services for project design and surveying <br />(b) Texas Department of Licensing and Regulation (TDLR) review <br />(c) Demolition and clearance of existing barriers <br />(d) Construction of ADA ramps and crosswalks <br />(e) Project Oversight <br />Estimated number of jobs to be created <br />Project Design 3 jobs <br />Surveying 3 jobs <br />Demolition & New Construction 7 jobs <br />Project Oversight 2 lobs <br />Total 15 jobs <br />ARRA Compliance Factors <br />• Job Creation - Project is estimated to create 15 jobs for the duration of the project, including creating 7 <br />• construction jobs; the construction industry has been significantly affected by the economic slowdown; <br />
The URL can be used to link to this page
Your browser does not support the video tag.