Laserfiche WebLink
INTERLOCAL COOPERATION AGREEMENT <br />FOR DESIGN, INSTALLATION, AND COMMISSIONING OF A <br />SOLAR/PHOTOVOLTAIC SYSTEM <br />BETWEEN CITY OF SAN MARCOS (OWNER) <br />AND LOWER COLORADO RIVER AUTHORITY (CONTRACTOR) <br />This Interlocal Cooperation Agreement ( "Agreement ") is entered into by and <br />between the Lower Colorado River Authority ( "LCRA "), a conservation and <br />reclamation district of the State of Texas, and the City of San Marcos ( "San <br />Marcos "), a home rule city and a political subdivision of the State of Texas, pursuant <br />to the authority granted and in compliance with the provisions of the Texas Interlocal <br />Cooperation Act (Chapter 791, Texas Government Code) to be effective for all <br />purposes as of JoL"Lt r , 201 (the "Effective Date "). (LCRA and San <br />Marcos may also be referred to individually as a "Party" and collectively as the <br />"Parties. ") <br />1. Entire Agreement. This Agreement, including any documents attached <br />hereto or referred to on the face hereof, constitutes the entire agreement between the <br />Parties, and any reference to "Agreement" shall be understood to include any such <br />attached or referenced documents (provided, however, that in the event of any <br />conflict between these terms and conditions and any such other documents, these <br />terms and conditions will control). LCRA shall not be bound by the terms and <br />conditions in San Marcos' purchase order or elsewhere unless expressly agreed to in <br />writing. In the absence of written acceptance of these terms, acceptance of services <br />hereunder shall constitute an acceptance of these terms and conditions by San <br />Marcos. <br />2. Calendar Day Contract. This Contract is a calendar day contract, <br />unless otherwise established in the Contract or agreed to by both Parties. <br />3. Project. As used herein, the term "Project" shall mean the design and <br />installation of an approximate 24kWh photovoltaic system on premises of the Five - <br />Mile Dam Park and connected to the electric grid of the Pedernales Electric <br />Cooperative utility. Any work outside of the Project will be considered a Change <br />Order and will be managed as detailed in Section 11 of this Agreement. <br />4. Work. As used herein the term "Work" shall mean all design, labor, <br />supervision, construction, construction documentation, construction tools, utility <br />coordination, and all other services necessary to timely and fully construct the <br />Project in accordance with the plans and specifications set forth in the Statement of <br />Work (SOW) attached hereto. <br />5. Compliance with Law and Permits. LCRA shall comply, and shall <br />cause all of its Subcontractors to comply, with all applicable laws and applicable <br />permits or approvals from or required by any government authority that are <br />necessary for the construction of the Project. LCRA shall perform the Work in a <br />manner to protect the environment on and off the Project site and avoid damage and <br />minimize nuisance to persons and property. No other permit, ordinance, or franchise <br />shall be required by San Marcos for LCRA's access and installation of the Project. <br />