Laserfiche WebLink
Page 5 <br />II. Would any types of emission control or particulate collection devices be used? <br />® No F] Yes (describe, including collection efficiencies) <br />i. If no control devices are used, how would emissions be vented? None anticipated. <br />7. Hydrologic Conditions/Water Quality <br />a. What is the closest body of water to the proposed project area and what is its distance from the project site? <br />4 blocks <br />b. What sources would supply potable and process water for the proposed project? <br />City of Sail Nlarcos <br />C. Quantify the daily or annual amount of wastewater that would be generated by the proposed project. <br />No additional generation. <br />d. Identify the local treatment facility that would receive wastewater from the proposed project. <br />® No discharges to local treatment facility <br />No additional generation. <br />e. Describe how wastewater would be collected and treated. <br />As it is currently, wastewater fiom the existing buildings flows into sewer mains that is then sent through a gravity <br />flow system to the wastewater treatment plant. <br />f. Would any run-off or leachates be produced from storage piles or waste disposal sites? <br />®No F1 Yes (describe source) <br />g. Would project require issuance of new or modified water permits to perform project work or site development? <br />® No F] Yes (describe) <br />h. Where would wastewater effluents from the proposed project be discharged? <br />® No wastewater produced <br />i. Would the proposed project be permitted to discharge effluents into an existing body of water? <br />®No n Yes (describe water use and effluent impact) <br />j. Would a new or modified National Pollutant Discharge Elimination System (NPDES) permit be required? <br />® No f-I Yes (describe) <br />k. Would the proposed project adversely affect the quality or movement of groundwater? <br />® No F] Yes (describe) <br />8. Solid and II azardous Wastes <br />a. Describe and estimate major nonhazardous solid wastes that would be generated from the project. Solid wastes are <br />defined as any solid, liquid, semi-solid, or contained gaseous material that is discarded or has served its intended <br />purpose, or is a manufacturing or mining by-product (40 CFR 260, Appendix I). Only those solid wastes created by <br />the construction of the proposed retrofits are anticipated from this project. <br />b. Would project require issuance of new or modified solid waste and/or hazardous waste related permits to perform <br />project work activities? <br />® No f-1 Yes (explain) <br />C. How and where would solid waste disposal be accomplished? <br />On-site t identify and describe location)