My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2016-032/Water Reuse Asset Management Plan
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2016
>
Res 2016-032/Water Reuse Asset Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2016 10:44:26 AM
Creation date
3/28/2016 8:46:09 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2016-32
Date
3/15/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of San Marcos <br />Water Reuse System <br />Asset Management Plan <br />3.1.1 Asset Replacement Costs <br />Replacement costs for each asset in the San Marcos reuse system was developed as the basis <br />for asset valuation. The replacement costs figures represent conceptual level costs estimates <br />including both material and installation costs on an asset -by -asset basis. The asset <br />replacement costs figures were reviewed with San Marcos staff in the Condition /Risk Workshop. <br />The replacement costs for each asset are shown in the asset inventory, Table 3.1, for facility <br />and pipeline assets. The estimated cost to replace the entire San Marcos reuse system is <br />approximately $7 million. <br />February 2016 Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.